WELL · 42-263-31942 · DISTRICT 8

Double Mountain 41 B-5 #6

Plugged

Kent County · Double Mountain (Canyon Sand) field  · Vertical

Double Mountain 41 B-5 #6 (API 42-263-31942) is a plugged well in Kent County, plugged November 17, 2025, last operated by Sharp Image Energy Inc..

The RRC has issued one drilling permit, issued December 2, 2010, permitted to 6,800 ft.

Completion filings report 10 formation tops, including Yates, San Andres, Clear Fork, Coleman Junction.

Its lease has reported 41.7K barrels of oil and 2.67K mcf of gas since November 2010, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Sharp Image Energy Inc.

Based in
Big Spring, TX
P-5 status
Active (A)
P-5 last filed
Jul 16, 2026
Permits on file
665
Phone
(432) 267-3126

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSharp Image Energy Inc.
Production reportsSharp Image Energy, Inc.through Jan 2026
Latest permitSharp Image Energy, Inc.Dec 2, 2010
6,800
total depth, ft
1
permits on file
Dec 2, 2010
last permit issued
Jan 1, 2020
completed
41.7K
cumulative oil, bbl
2.67K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 1, 2020
Shut in
—
Plugged
Nov 17, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Double Mountain 41 B-5 O-11-69648Double Mountain (Canyon Sand)Sharp Image Energy, Inc.241.7K2.67KNov 2010 – Jul 2026

Oil, barrels lease total

Last 12 months 10 · prior 12 446(-98%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sharp Image Energy, Inc.Nov 2010 → Jan 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
706087-99DrillSharp Image Energy, Inc.Nov 30, 2010Dec 2, 2010Dec 7, 20106,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-69648————

Formation tops

As filed on W-2/G-1. Subsea from 2,135 ft elevation.Download CSV →

FormationMD ftSubsea
YatesYATES - OVERPRESSURED, INERT GAS7001,435
San AndresSAN ANDRES - HIGH FLOWS, H2S, CO1,1001,035
Clear ForkCLEARFORK2,10035
Coleman JunctionCOLEMAN JUNCTION - POSSIBLE LOST2,500-365
Wichita-AlbanyWICHITA ALBANY3,000-865
Noodle Creek4,140-2,005
Noodle Creek4,535-2,400
Fuller4,900-2,765
Wolfcamp5,300-3,165
Canyon5,924-3,789
CanyonCANYON B5,980-3,845
CanyonCANYON - ACTIVE CO2 FLOOD6,100-3,965
CanyonCANYON D6,170-4,035
Pennsylvanian6,450-4,315

Perforations

Perforated and open-hole intervals.

FromToType
6,0196,121Perforated
6,0356,058Perforated
6,1196,121Perforated
6,1266,128Perforated
6,2306,238Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,90811940 S
4.56,2797.875800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 30, 2025Feb 5, 2025—
00Jan 27, 2015Jan 8, 2015—
00Aug 14, 2014Sep 20, 2013—
00Nov 7, 2011Sep 8, 2011—
00Jul 26, 2011Feb 22, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
1.28M
bbl, all reported
May 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000103435H-1 InjectionPlugged Dec 2, 20252,5003,0176,035–6,300

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26331942, documented in the API reference.