WELL · 42-303-31323 · DISTRICT 8

Lif-Lubheirs #17H

N

Lubbock County · Edmisson (Clear Fork) field  · Horizontal

Lif-Lubheirs #17H (API 42-303-31323) is a horizontal well in Lubbock County operated by Texland Petroleum L.P., completed January 13, 2003.

The RRC has issued 2 drilling permits between 1996 and 2010, permitted to 5,200 ft.

Completion filings report 3 formation tops, including Rustler, Yates, Clear Fork.

Its lease has reported 2.34M barrels of oil and 7.92K mcf of gas since January 1993, last reporting in July 2026. The lease carries 25 wells, so these are lease totals, not this well alone.

Operator of record

Texland Petroleum L.P.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Oct 15, 2025
Permits on file
694
Phone
(817) 336-2751

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexland Petroleum L.P.
Production reportsTexland Petroleum, L.P.through Apr 2026
Latest permitTexland Petroleum, L.P.Dec 23, 2010
5,200
total depth, ft
2
permits on file
Dec 23, 2010
last permit issued
Jan 13, 2003
completed
2.34M
cumulative oil, bbl
7.92K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 13, 2003
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 25 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lif-Lubheirs O-11-65679Edmisson (Clear Fork)Texland Petroleum, L.P.252.34M7.92KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 32,755 · prior 12 34,366(-5%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texland-Rector & SchumacherJan 1993 → Nov 2000
  2. 2Texland Petroleum Inc.Dec 2000 → Mar 2003
  3. 3Texland Petroleum, L.P.Apr 2003 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
707153-99RecompletionTexland Petroleum, L.P.Dec 15, 2010Dec 23, 2010Feb 23, 20114,990
451802-99DrillTexland-Rector & SchumacherAug 22, 1996Aug 27, 1996Oct 22, 19965,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-65679————
—— O-11-65679————

Formation tops

As filed on W-2/G-1. Subsea from 3,216 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler1,6101,606
Yates2,0451,171
Clear ForkCLEARFORK5,146-1,930
Clear ForkCLEARFORK5,150-1,934

Perforations

Perforated and open-hole intervals.

FromToType
4,9765,107Perforated
5,2407,106Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62536812.25380 S
8.62537012.25380 S
5.55,1507.8751,600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 10, 2012Jun 28, 2011Yes
00Jan 13, 2005Jan 23, 2003—
00Apr 9, 1997Dec 11, 1996Yes
00Mar 14, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Mar 1996
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000079540H-1 InjectionNot activated7002,0004,900–5,200

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119951996

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30331323, documented in the API reference.