WELL · 42-305-30351 · DISTRICT 8

Morris "B" #2

N

Lynn County  · Vertical

Morris "B" #2 (API 42-305-30351) is a permitted well in Lynn County filed by Fina Oil & Chemical Company; no completion report is on file yet.

The RRC has issued 3 drilling permits between 1985 and 1989, permitted to 9,700 ft.

Completion filings report 8 formation tops, including Rustler, Yates, San Andres, Spraberry.

Its 2 leases have reported 238K barrels of oil and 80K mcf of gas since January 1993, last reporting in July 2026. The leases carry 9 wells, so these are lease totals, not this well alone.

Operator of record

Fina Oil & Chemical Company

Dallas, TX · P-5 Y, filed Apr 13, 2001 · 1,328 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsSSC, Inc.through Apr 2026
Latest permitFina Oil & Chemical CompanyAug 31, 1989
9,700
total depth, ft
3
permits on file
Aug 31, 1989
last permit issued
—
completed
238K
cumulative oil, bbl
80K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Draw, NE. (Spraberry) Unit O-11-66307Draw, NE. (Spraberry)SSC, Inc.9238K80KJan 1993 – Jul 2026
— O-11-66465——000—

Oil, barrels lease total

Last 12 months 597 · prior 12 61(+879%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fina Oil & Chemical CompanyJan 1993 → Sep 1993
  2. 2Merit Energy CompanyOct 1993 → Apr 2000
  3. 3Permian Resources, Inc.May 2000 → Apr 2004
  4. 4Chesapeake Operating, Inc.May 2004 → Aug 2009
  5. 5SSC, Inc.Sep 2009 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
359814-99RecompletionFina Oil & Chemical CompanyMay 30, 1989Aug 31, 1989—9,250
301443-99DrillAmoco Production CompanyMar 27, 1986Apr 24, 1986—9,700
271053-99DrillAmoco Production CompanyMar 26, 1985Mar 29, 1985—9,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-66307————
—— O-11-66307————
—— O-11-66465————

Formation tops

As filed on W-2/G-1. Subsea from 2,892 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler1,5201,372
Yates2,050842
San Andres3,225-333
Spraberry5,935-3,043
SpraberryUPPER SPRABERRY5,976-3,084
Dean7,320-4,428
Canyon8,430-5,538
Strawn8,585-5,693
Mississippian9,020-6,128

Perforations

Perforated and open-hole intervals.

FromToType
5,9765,984Perforated
6,1906,204Perforated
9,0209,082Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37534017.5385 S
9.6253,47512.251,750 S
75,2508.751,300 S
79,2508.751,050 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 27, 1992Apr 15, 1992—
00Mar 7, 1990Dec 1, 1989Yes
00Mar 7, 1990Sep 25, 1989Yes
00Feb 22, 1990Dec 11, 1986Yes
00Feb 22, 1990——
00Feb 22, 1989Dec 11, 1986Yes
00Feb 15, 1989——
00Jan 7, 1987Dec 11, 1986Yes
00Jan 3, 1987——
00Dec 30, 1986Dec 11, 1986Yes
00Dec 20, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30530351, documented in the API reference.