WELL · 42-329-39393 · DISTRICT 8

Sanders June TR -A1- #38

Shut in

Midland County · Spraberry (Trend Area) field · Shut IN  · Vertical

Sanders June TR -A1- #38 (API 42-329-39393) is a well in Midland County operated by Apache Corporation, completed October 9, 2014 and listed as shut in on the RRC schedule, shut in May 1, 2024.

The RRC has issued one drilling permit, issued June 3, 2014, permitted to 11,716 ft.

Completion filings report 10 formation tops, including Yates, Seven Rivers, Queen, Grayburg.

Its 2 leases have reported 137K barrels of oil and 745K mcf of gas since January 1995, last reporting in July 2026. The leases carry 12 wells, so these are lease totals, not this well alone.

Operator of record

Apache Corporation

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Dec 3, 2025
Permits on file
9,756
Phone
(713) 954-5500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleApache Corporation
Production reportsApache Corporationthrough Oct 2023
Latest permitApache CorporationJun 3, 2014
11,716
total depth, ft
1
permits on file
Jun 3, 2014
last permit issued
Oct 9, 2014
completed
137K
cumulative oil, bbl
745K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1995 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 9, 2014
Shut in
May 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 12 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sanders, June TR -A- O-10-34421Spraberry (Trend Area)Apache Corporation10115K668KJan 1995 – Jul 2026
Sanders, June TR -A1- O-10-48284Spraberry (Trend Area)Apache Corporation221.9K76.2KNov 2014 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

05001K202420252026

Oil, barrels lease total

Last 12 months 0 · prior 12 0

0204060202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Arco PermianJan 1995 → Dec 2001
  2. 2BP America Production CompanyMar 2002 → Nov 2010
  3. 3Apache CorporationDec 2010 → Aug 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
785875-99DrillApache CorporationApr 30, 2014Jun 3, 2014Jul 3, 201412,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 9, 2014Sanders June TR -A1- O-10-48284Spraberry (Trend Area)Apache CorporationShut IN · shut in May 1, 202411,716
Oct 9, 2014Sanders June TR -A- O-10-34421Spraberry (Trend Area)Apache CorporationNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 2,893 ft elevation.Download CSV →

FormationMD ftSubsea
Yates2,84944
Seven Rivers3,109-216
Queen4,061-1,168
Grayburg4,855-1,962
San AndresSAN ANDRES - HIGH FLOWS, H2S, CO6,100-3,207
Clear ForkCLEARFORK7,004-4,111
Spraberry7,741-4,848
Cline9,686-6,793
Glorieta——
Santa Rosa——

Perforations

Perforated and open-hole intervals.

FromToType
8,2609,904Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37540017.5410 S
8.6255,772111,160 S
5.511,7167.875850 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 14, 2017Dec 3, 2015Yes
00Jan 27, 2016Dec 3, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32939393, documented in the API reference.