WELL · 42-329-39952 · DISTRICT 8

TXL 11 Unit 1 #0213AH

Y

Midland County · Spraberry (Trend Area) field · Producing  · Horizontal

Txl 11 Unit 1 #0213AH (API 42-329-39952) is a horizontal well in Midland County operated by Xto Energy Inc., completed August 7, 2015 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 2014 and 2017, permitted to 9,363 ft.

Completion filings report 9 formation tops, including Santa Rosa, Yates, Seven Rivers, Queen.

Its 2 leases have reported 2.14M barrels of oil and 9.62M mcf of gas since February 2015, last reporting in July 2026. The leases carry 16 wells, so these are lease totals, not this well alone.

Operator of record

XTO Energy Inc.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Apr 2026
Latest permitXTO Energy Inc.May 10, 2017
9,363
total depth, ft
2
permits on file
May 10, 2017
last permit issued
Aug 7, 2015
completed
2.14M
cumulative oil, bbl
9.62M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2015 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 7, 2015
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 16 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
TXL 11 Unit 1 O-10-48484Spraberry (Trend Area)XTO Energy Inc.101.33M8MJan 2017 – Jul 2026
TXL 11 Unit 1 O-10-46343Spraberry (Trend Area) R 40 ExcXTO Energy Inc.6813K1.62MFeb 2015 – Sep 2017

Oil, barrels lease total

Last 12 months 74,586 · prior 12 93,574(-20%)

010K20K202420252026

Gas, mcf lease total

Last 12 months 165,045 · prior 12 181,637(-9%)

050K100K150K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Feb 2015 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
825933-99Field transferXTO Energy Inc.Apr 26, 2017May 10, 2017Feb 17, 20159,560
800914-99DrillXTO Energy Inc.Nov 25, 2014Dec 1, 2014Feb 17, 20159,560

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 7, 2015TXL 11 Unit 1 O-10-48484Spraberry (Trend Area)XTO Energy Inc.Producing9,363
Oct 9, 2015TXL 11 Unit 1 O-10-46343Spraberry (Trend Area) R 40 ExcXTO Energy Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 2,667 ft elevation.Download CSV →

FormationMD ftSubsea
Santa Rosa7641,903
Yates2,59275
Seven Rivers2,959-292
Queen3,761-1,094
Grayburg4,215-1,548
San AndresSAN ANDRES - HIGH FLOWS, H2S, CO4,381-1,714
Glorieta4,957-2,290
Clear ForkCLEARFORK6,793-4,126
Spraberry7,578-4,911
SpraberrySPRABERRY UPPER-DEAN8,944-6,277

Perforations

Perforated and open-hole intervals.

FromToType
9,74417,398Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,20817.51,098 S
9.6258,67112.25785 S
5.517,5378.52,078 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 12, 2017May 18, 2017Yes
00May 6, 2016Jan 26, 2016—
00Oct 8, 2015Sep 2, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32939952, documented in the API reference.