TEXAS · WELLS · MIDLAND COUNTY · MIDKIFF "48" LEASE · API 42-329-40100 · DISTRICT 7B

Midkiff 48 #13

Plugged

Midland County · Spraberry (Trend Area) field  · Vertical

Midkiff 48 #13 (API 42-329-40100) is a plugged well in Midland County, plugged June 25, 2019, last operated by Xto Energy Inc..

The RRC has issued one drilling permit (amended once), issued February 6, 2015, permitted to 12,200 ft.

Completion filings report 9 formation tops, including Santa Rosa, Yates, Seven Rivers, Queen.

Its lease has reported 120K barrels of oil and 458K mcf of gas since January 1993, last reporting in July 2026. The lease carries 8 wells, so these are lease totals, not this well alone.

Operator of record

XTO Energy Inc.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Sep 2023
Latest permitXTO Energy Inc.Feb 6, 2015
12,200
total depth, ft
2
permits on file
Feb 6, 2015
last permit issued
Jun 2, 2016
completed
120K
cumulative oil, bbl
458K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 2, 2016
Shut in
—
Plugged
Jun 25, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Midkiff "48" O-10-32943Spraberry (Trend Area)XTO Energy Inc.8120K458KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 0

0200400202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Plains Petroleum Operating Co.Jan 1993 → Oct 1996
  2. 2Medallion Exploration Corp.Nov 1996 → Dec 1997
  3. 3Medex Texas, LLPJan 1998 → Nov 2001
  4. 4Prasad, Hari Production Co.Dec 2001 → Aug 2002
  5. 5Prasad, Ltd.Sep 2002 → Oct 2005
  6. 6Hppc, Inc.Nov 2005 → Apr 2010
  7. 7Desert Production, Inc.Sep 2010 → Oct 2011
  8. 8XTO Energy Inc.Apr 2015 → Sep 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
803573-98DrillXTO Energy Inc.May 13, 2016Feb 6, 2015Mar 13, 201512,200
803573-99DrillXTO Energy Inc.Feb 5, 2015Feb 6, 2015Mar 13, 201512,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 2, 2016Midkiff 48 O-10-32943Spraberry (Trend Area)XTO Energy Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,779 ft elevation.Download CSV →

FormationMD ftSubsea
Santa Rosa7502,029
Yates2,601178
Seven Rivers2,968-189
Queen3,684-905
Grayburg4,200-1,421
San AndresSAN ANDRES - HIGH FLOWS, H2S, CO4,387-1,608
Glorieta5,005-2,226
Clear ForkCLEARFORK6,705-3,926
Spraberry7,485-4,706
SpraberrySPRABERRY UPPER-DEAN8,897-6,118

Perforations

Perforated and open-hole intervals.

FromToType
7,77211,788Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37549617.5520 S
8.6254,600111,050 S
5.512,0687.8751,430 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 17, 2016Jun 15, 2016Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32940100, documented in the API reference.