TEXAS · WELLS · MIDLAND COUNTY · RIO GRANDE 25-20SL UNIT 1 LEASE · API 42-329-40460 · DISTRICT 7B

Rio Grande 25-20SL Unit 1 #3HA

On schedule

Midland County · Spraberry (Trend Area) field · Shut In  · Horizontal

Rio Grande 25-20sl Unit 1 #3HA (API 42-329-40460) is a horizontal well in Midland County operated by Diamondback E&P LLC, completed June 5, 2016 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued September 4, 2015, permitted to 9,440 ft.

It was permitted by Endeavor Energy Resources L.P. and has since transferred to Diamondback E&P LLC on the wellbore schedule.

Completion filings report 9 formation tops, including Santa Rosa, Yates, Seven Rivers, Queen.

Its lease has reported 2.34M barrels of oil and 9.3M mcf of gas since February 2016, last reporting volume in April 2026. The lease carries 13 wells, so these are lease totals, not this well alone.

Operator of record

Diamondback E&P LLC

Permitted by Endeavor Energy Resources L.P.; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active – Extension (X)
P-5 last filed
May 4, 2026
Permits on file
5,254
Phone
(432) 221-7400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDiamondback E&P LLC
Production reportsDiamondback E&P LLCthrough Apr 2026
Latest permitEndeavor Energy Resources L.P.Sep 4, 2015

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,440
total depth, ft
2
permits on file
Sep 4, 2015
last permit issued
Jun 5, 2016
completed
2.34M
cumulative oil, bbl
9.3M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · FEB 2016 THROUGH APR 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 5, 2016
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 13 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rio Grande 25-20SL Unit 1 O-10-47595Spraberry (Trend Area)Diamondback E&P LLC132.34M9.3MFeb 2016 – Apr 2026

Gas, mcf lease total

Last 12 months 1,190,361 · prior 12 926,584(+28%)

050K100K150K202420252026

Oil, barrels lease total

Last 12 months 73,230 · prior 12 92,605(-21%)

05K10K15K202420252026

Wells named Rio Grande 25-20SL Unit 1

Diamondback E&P LLC's other wells filed under this lease name in Midland County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Endeavor Energy Resources L.P.Feb 2016 → Dec 2024
  2. 2Diamondback E&P LLCJan 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
809922-98DrillEndeavor Energy Resources L.P.Nov 11, 2015Sep 4, 2015Dec 14, 201513,000
809922-99DrillEndeavor Energy Resources L.P.Aug 31, 2015Sep 4, 2015Dec 14, 201513,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 5, 2016Rio Grande 25-20SL Unit 1 O-10-47595Spraberry (Trend Area)Diamondback E&P LLCShut In9,440

Formation tops

As filed on W-2/G-1. Subsea from 2,706 ft elevation.Download CSV →

FormationMD ftSubsea
Santa Rosa1,0001,706
Yates1,2501,456
Seven Rivers1,3001,406
Queen3,700-994
Grayburg3,900-1,194
San AndresSAN ANDRES - HIGH FLOWS, H2S, CO4,450-1,744
Glorieta5,750-3,044
Clear ForkCLEARFORK7,260-4,554
Spraberry7,675-4,969
SpraberrySPRABERRY UPPER-DEAN8,880-6,174

Perforations

Perforated and open-hole intervals.

FromToType
9,83517,477Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,29817.5810 S
9.6258,78212.25900 S
5.517,6008.52,280 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Aug 22, 2016Aug 9, 2016Yes

Well logs

1 log loaded from the RRC's log index, the latest received Feb 28, 2019. Cement bond. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.

Open the RRC's log search for this well ↗
Logas describedFiles Intervalft, as filedDatereceivedSizeMB
Cement BondSpans Santa Rosa, Yates, Seven Rivers, Queen, Grayburg, San Andres, Glorieta, Clear Fork, SpraberryTIFF0 to 8,814Feb 28, 20195.05

"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32940460, documented in the API reference.