WELL · 42-341-32405 · DISTRICT 10

Sneed A #3033R

Plugged

Moore County · Panhandle West (Red Cave) field  · Vertical

Sneed A #3033R (API 42-341-32405) is a plugged well in Moore County, plugged December 17, 2012, last operated by Parallel Energy LP.

The RRC has issued one drilling permit, issued June 22, 1995, permitted to 2,207 ft.

It was permitted by Anadarko Petroleum Corp. and has since transferred to Parallel Energy LP on the wellbore schedule.

Completion filings report 7 formation tops, including Glorieta, Cimaron Anhydrite, Cimmaron Anhydrite, Tubb.

Operator of record

Parallel Energy LP

Permitted by Anadarko Petroleum Corp.; the EWA schedule now lists a different operator.

Based in
Tulsa, OK
P-5 status
Inactive (I)
P-5 last filed
May 12, 2015
Permits on file
59
Phone
(918) 712-7008

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleParallel Energy LP
Production reportsAnadarko Petroleum Corporationthrough Oct 1995
Latest permitAnadarko Petroleum Corp.Jun 22, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,207
total depth, ft
1
permits on file
Jun 22, 1995
last permit issued
Jul 17, 1995
completed
0
cumulative oil, bbl
1.77K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1995 THROUGH Dec 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 17, 1995
Shut in
—
Plugged
Dec 17, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sneed "A" G-14-155593Panhandle, West (Red Cave)Parallel Energy LP101.77KJul 1995 – Dec 2012

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko Petroleum CorporationJul 1995 → Oct 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
437146-99DrillAnadarko Petroleum Corp.Jun 22, 1995Jun 22, 1995Jun 23, 19952,207

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-155593————

Formation tops

As filed on W-2/G-1. Subsea from 3,389 ft elevation.Download CSV →

FormationMD ftSubsea
Glorieta1,0022,387
GlorietaGLORIETTA1,0022,387
Cimaron Anhydrite1,3082,081
Cimmaron Anhydrite1,3082,081
Tubb1,4221,967
Cimmaron Salt1,5871,802
Red Cave1,7251,664
Panhandle Lime2,1411,248

Perforations

Perforated and open-hole intervals.

FromToType
1,7252,141Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37540617.5420 S
9.6251,67912.25315 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 18, 1996Feb 15, 1996—
00Nov 30, 1995Jul 25, 1995Yes
00Oct 13, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34132405, documented in the API reference.