TEXAS · WELLS · MOORE COUNTY · ANDERSON 406 LEASE · API 42-341-32940 · DISTRICT 08

Anderson 406 #3

Shut in

Moore County · Etter (Wolfcamp) field · Temp Abandoned  · Vertical

Anderson 406 #3 (API 42-341-32940) is a well in Moore County operated by Pantera Energy Company, completed December 1, 2005 and listed as temp abandoned on the RRC schedule, shut in June 1, 2016.

The RRC has issued one drilling permit, issued August 16, 2005, permitted to 3,475 ft.

It was permitted by BP America Production Company and has since transferred to Pantera Energy Company on the wellbore schedule.

Completion filings report 4 formation tops, including Permian (undifferentiated), Glorieta, Panhandle Lime, Brown Dolomite.

No lease production has been reported under this well’s leases.

Operator of record

Pantera Energy Company

Permitted by BP America Production Company; the EWA schedule now lists a different operator.

Based in
Amarillo, TX
P-5 status
Active (A)
P-5 last filed
Oct 1, 2025
Permits on file
359
Phone
(806) 376-6625

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePantera Energy Company
Production reportsPantera Energy Companythrough May 2016
Latest permitBP America Production CompanyAug 16, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,475
total depth, ft
1
permits on file
Aug 16, 2005
last permit issued
Dec 1, 2005
completed
0
cumulative oil, bbl
41.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2005 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 1, 2005
Shut in
Jun 1, 2016
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Anderson 406 G-14-218710Etter (Wolfcamp)Pantera Energy Company1041.4KDec 2005 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1BP America Production CompanyAug 2006 → Sep 2014
  2. 2Pantera Energy CompanyOct 2014 → May 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
605025-99DrillBP America Production CompanyAug 16, 2005Aug 16, 2005Sep 7, 20053,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 1, 2005Anderson 406 G-14-218710Etter (Wolfcamp)Pantera Energy CompanyTemp Abandoned · shut in Jun 1, 20163,475

Formation tops

As filed on W-2/G-1. Subsea from 3,637 ft elevation.Download CSV →

FormationMD ftSubsea
Permian (undifferentiated)PERMIAN RED BEDS6303,007
GlorietaGLORIETTA1,2302,407
Panhandle Lime2,880757
Brown Dolomite3,353284

Perforations

Perforated and open-hole intervals.

FromToType
3,0233,450Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62573812.25510 S
5.53,0227.875585 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 30, 2007Aug 28, 2006—
00Jan 26, 2007Jul 31, 2006Yes
00Sep 7, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34132940, documented in the API reference.