WELL · 42-359-30229 · DISTRICT 10
Billy S Creek 7 13 14 #5
Oldham County · Brandi (Granite Wash Upper) field · Vertical
Billy S Creek 7 13 14 #5 (API 42-359-30229) is a plugged well in Oldham County, plugged January 27, 1990, last operated by Arrow Oil & Gas LLC.
The RRC has issued one drilling permit, issued October 17, 1983, permitted to 8,300 ft.
It was permitted by Baker & Taylor Drilling CO. and has since transferred to Arrow Oil & Gas LLC on the wellbore schedule.
Completion filings report 5 formation tops, including Red Cave, Panhandle Lime, Brown Dolomite, Canyon.
Operator of record
Permitted by Baker & Taylor Drilling Co.; the EWA schedule now lists a different operator.
- Based in
- Norman, OK
- P-5 status
- Active (A)
- P-5 last filed
- Oct 16, 2025
- Permits on file
- 34
- Phone
- (405) 364-2601
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Arrow Oil & Gas LLC |
| Production reports | none |
| Latest permit | Baker & Taylor Drilling Co.Oct 17, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,300
- total depth, ft
- 1
- permits on file
- Oct 17, 1983
- last permit issued
- Dec 1, 1983
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 1, 1983
- Shut in
- —
- Plugged
- Jan 27, 1990
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 217561-99 | Drill | Baker & Taylor Drilling Co. | Oct 17, 1983 | Oct 17, 1983 | — | 8,300 |
Formation tops
As filed on W-2/G-1. Subsea from 3,445 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Red Cave | 3,140 | 305 |
| Panhandle Lime | 3,920 | -475 |
| Brown Dolomite | 4,384 | -939 |
| CanyonCANYON LIMESTONE | 7,750 | -4,305 |
| CanyonCANYON GRANITE WASH | 7,762 | -4,317 |
| Precambrian | 8,266 | -4,821 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,774 | 7,786 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,504 | 11 | 700 S |
| 5.5 | 8,375 | 7.875 | 275 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 8, 1984 | Jan 2, 1984 | — |
| 00 | Jan 25, 1984 | Jan 2, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-359-30229 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-359-30229 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35930229, documented in the API reference.