WELL · 42-363-36269 · DISTRICT 9

Halsell Dallas Production Unit #B 17

N

Palo Pinto County · KRS (Marble Falls) field  · Vertical

Halsell Dallas Production Unit #B 17 (API 42-363-36269) is a well in Palo Pinto County operated by Eagleridge Operating LLC, completed September 19, 2015.

The RRC has issued one drilling permit, issued October 8, 2014, permitted to 6,100 ft.

It was permitted by Brigadier Operating, LLC and has since transferred to Eagleridge Operating LLC on the wellbore schedule.

Completion filings report 11 formation tops, including Palo Pinto, Buttram Sand - Disposal, Caddo, Atoka.

Its 2 leases have reported 18.8K barrels of oil and 795K mcf of gas since December 2014, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Eagleridge Operating LLC

Permitted by Brigadier Operating, LLC; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
129
Phone
(214) 295-6704

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEagleridge Operating LLC
Production reportsPetrobal Omega 1, LLCthrough May 2021
Latest permitBrigadier Operating, LLCOct 8, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,100
total depth, ft
1
permits on file
Oct 8, 2014
last permit issued
Sep 19, 2015
completed
18.8K
cumulative oil, bbl
795K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 19, 2015
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Halsell Dallas Production Unit G-13-291473KRS (Marble Falls)Eagleridge Operating, LLC100Jun 2021 – Jul 2026
Halsell Dallas Production Unit O-13-33181KRS (Marble Falls)Eagleridge Operating, LLC218.8K795KDec 2014 – Jul 2024

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Brigadier Operating, LLCSep 2015 → Aug 2017
  2. 2Petrobal Omega 1, LLCSep 2017 → Jan 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
797235-99DrillBrigadier Operating, LLCSep 27, 2014Oct 8, 2014Sep 15, 20156,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-291473————
—— O-13-33181————

Formation tops

As filed on W-2/G-1. Subsea from 1,153 ft elevation.Download CSV →

FormationMD ftSubsea
Palo PintoPALO PINTO - DISPOSAL554599
Buttram Sand - Disposal1,505-352
Caddo4,036-2,883
CaddoCADDO SAND - DISPOSAL4,036-2,883
AtokaATOKA - DISPOSAL4,216-3,063
Big SalineBIG SALINE - DISPOSAL4,561-3,408
MississippianMISSISSIPPIAN - DISPOSAL4,918-3,765
EllenburgerELLENBURGER - DISPOSAL5,079-3,926
CanyonCANYON SAND - DISPOSAL——
GunsightGUNSIGHT - DISPOSAL——
StrawnSTRAWN - DISPOSAL——
Unidentified-County Regular (Gas——

Perforations

Perforated and open-hole intervals.

FromToType
4,5664,782Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62533712.25175 S
5.55,1328.75260 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 29, 2021Jun 29, 2021—
00Jan 8, 2016Dec 23, 2015Yes
00Apr 23, 2015Apr 17, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36336269, documented in the API reference.