WELL · 42-371-31664 · DISTRICT 8

Coyanosa Unit #1 #504

N

Pecos County · Coyanosa (Miss. 10475) field  · Vertical

Coyanosa Unit #1 #504 (API 42-371-31664) is a well in Pecos County operated by Mobil Producing TX. & N.M. Inc., completed January 7, 1993.

The RRC has issued one drilling permit, issued October 22, 1997, permitted to 10,650 ft.

Completion filings report 4 formation tops, including Rustler, Anhydrite, Delaware, Wolfcamp.

No lease production has been reported under this well’s leases.

Operator of record

Mobil Producing TX. & N.M. Inc.

Based in
Spring, TX
P-5 status
Active (A)
P-5 last filed
Jun 4, 2025
Permits on file
6,763
Phone
(346) 474-9142

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMobil Producing TX. & N.M. Inc.
Production reportsCannan, Morristhrough Jan 1997
Latest permitMobil Producing TX. & N.M. Inc.Oct 22, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,650
total depth, ft
1
permits on file
Oct 22, 1997
last permit issued
Jan 7, 1993
completed
0
cumulative oil, bbl
2.58M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 7, 1993
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Coyanosa Wolfcamp Unit G-10-166673Coyanosa (Wolfcamp)XTO Energy Inc.100Oct 1997 – Jul 2026
Coyanosa Unit #1 G-10-68030Coyanosa (Miss. 10475)Mobil Producing TX. & N.M. Inc.102.58MJan 1993 – Oct 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cannan, MorrisJan 1993 → Jan 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
469066-99RecompletionMobil Producing TX. & N.M. Inc.Oct 21, 1997Oct 22, 1997Sep 24, 199710,650

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-68030————
—— G-10-166673————

Formation tops

As filed on W-2/G-1. Subsea from 2,640 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler1,795845
Anhydrite4,740-2,100
Delaware4,810-2,170
Wolfcamp9,150-6,510

Perforations

Perforated and open-hole intervals.

FromToType
10,02710,340Perforated
10,45310,550Perforated
10,45310,870Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,80512.25750 S
79,1308.5625 S
2.37510,730——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 28, 1998Nov 6, 1997Yes
00Mar 2, 1998——
00Apr 6, 1993Feb 4, 1993—
00Jan 12, 1984Aug 13, 1976—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37131664, documented in the API reference.