WELL · 42-371-35666 · DISTRICT 8

Mendel Estate -38- #2

N

Pecos County · Maralo (Wolfcamp) field  · Vertical

Mendel Estate -38- #2 (API 42-371-35666) is a well in Pecos County operated by Primexx Operating Corporation, completed February 25, 1986.

The RRC has issued one drilling permit, issued November 26, 1985, permitted to 11,400 ft.

It was permitted by Maralo, Inc. and has since transferred to Primexx Operating Corporation on the wellbore schedule.

Completion filings report 6 formation tops, including Rustler, Cherry Canyon, Brushy Canyon, Bone Spring.

Its 2 leases have reported 40.6K barrels of oil and 2.05M mcf of gas since January 1993, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Primexx Operating Corporation

Permitted by Maralo, Inc.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Delinquent (D)
P-5 last filed
Mar 11, 2022
Permits on file
310
Phone
(214) 369-5909

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePrimexx Operating Corporation
Production reportsVaquero Operatingthrough Apr 2026
Latest permitMaralo, Inc.Nov 26, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,400
total depth, ft
1
permits on file
Nov 26, 1985
last permit issued
Feb 25, 1986
completed
40.6K
cumulative oil, bbl
2.05M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 25, 1986
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mendel Estate -38- G-10-282494Maralo (Wolfcamp)Vaquero Operating10172KMar 2017 – Jul 2026
Mendel Estate -38- O-10-29950Maralo (Wolfcamp)Primexx Operating Corporation340.6K1.88MJan 1993 – Feb 2018

Gas, mcf lease total

Last 12 months 25,437 · prior 12 18,714(+36%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Maralo, Inc.Jan 1993 → Dec 1998
  2. 2Maralo, LLCJan 1999 → Nov 2004
  3. 3COG Operating LLCDec 2004 → Feb 2009
  4. 4WJC, Inc.Mar 2009 → May 2013
  5. 5Primexx Operating CorporationMar 2014 → Sep 2017
  6. 6Black Mountain Oil & Gas II LLCOct 2017 → Nov 2019
  7. 7Vaquero OperatingDec 2019 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
291782-99DrillMaralo, Inc.Nov 25, 1985Nov 26, 1985—11,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-282494————
—— O-10-29950————

Formation tops

As filed on W-2/G-1. Subsea from 2,944 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler1,4581,486
Cherry Canyon5,681-2,737
Brushy Canyon6,894-3,950
Bone SpringBONE SPRINGS LIME7,565-4,621
Third BS Sand9,699-6,755
Wolfcamp9,900-6,956

Perforations

Perforated and open-hole intervals.

FromToType
10,84310,938Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1670020800 S
10.753,95314.752,900 S
7.62510,2009.5350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 27, 2017Apr 10, 2017Yes
00Apr 1, 1986Mar 17, 1986Yes
00Mar 25, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37135666, documented in the API reference.