TEXAS · WELLS · PECOS COUNTY · PRIEST 39 LEASE · API 42-371-37561 · DISTRICT 7B
Priest 39 #1
Pecos County · Wildcat field · Vertical
Priest 39 #1 (API 42-371-37561) is a plugged well in Pecos County, plugged December 3, 2006, last operated by Approach Operating LLC.
The RRC has issued one drilling permit, issued May 16, 2005, permitted to 9,000 ft.
Completion filings report 3 formation tops, including Base Cretaceous (marker), Top Of Reef Marker, Canyon.
Its lease has reported 1.14K barrels of oil since September 2005, last reporting in August 2018.
Operator of record
- Based in
- Fort Worth, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Nov 15, 2019
- Permits on file
- 1,045
- Phone
- (817) 989-9000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Approach Operating LLCthrough Jun 2006 |
| Latest permit | Approach Operating LLCMay 16, 2005 |
- 9,000
- total depth, ft
- 1
- permits on file
- May 16, 2005
- last permit issued
- Oct 18, 2005
- completed
- 1.14K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2005 THROUGH Aug 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 18, 2005
- Shut in
- —
- Plugged
- Dec 3, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Priest 39 O-10-39988 | Wildcat | Approach Operating LLC | 1 | 1.14K | 0 | Sep 2005 – Aug 2018 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Approach Operating LLCOct 2005 → Jun 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 600690-99 | Drill | Approach Operating LLC | May 16, 2005 | May 16, 2005 | Aug 3, 2005 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 18, 2005 | Priest 39 O-10-39988 | Wildcat | Approach Operating LLC | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,076 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base Cretaceous (marker)BASE OF CRETACEOUS | 925 | 2,151 |
| Top of Reef Marker | 4,830 | -1,754 |
| CanyonTOP OF CANYON MARKER | 7,650 | -4,574 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,287 | 7,300 | Perforated |
| 7,506 | 7,526 | Perforated |
| 7,601 | 7,630 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 11.75 | 968 | 14.75 | 500 S |
| 8.625 | 3,280 | 11 | 480 S |
| 5.5 | 7,700 | 7.875 | 240 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 15, 2011 | Feb 13, 2006 | Yes |
| 00 | Jul 2, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-371-37561 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-371-37561 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/37137561, documented in the API reference.