WELL · 42-371-39496 · DISTRICT 8

Boss Jack #1

Y

Pecos County · Tunstill (Delaware) field · Injection  · Vertical

Boss Jack #1 (API 42-371-39496) is a well in Pecos County operated by Vtx Energy Operating LLC, completed May 2, 2017 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued March 8, 2017, permitted to 7,500 ft.

It was permitted by Jagged Peak Energy LLC and has since transferred to Vtx Energy Operating LLC on the wellbore schedule.

Completion filings report 10 formation tops, including Toborg, Soma, Rustler, Seven Rivers.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 2.66M barrels injected in the 12 months reported through April 2026.

Operator of record

VTX Energy Operating LLC

Permitted by Jagged Peak Energy LLC; the EWA schedule now lists a different operator.

Austin, TX · P-5 Y, filed May 4, 2026 · 164 permits on file · (800) 826-8119

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleVTX Energy Operating LLC
Production reportsnone
Latest permitJagged Peak Energy LLCMar 8, 2017

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,500
total depth, ft
1
permits on file
Mar 8, 2017
last permit issued
May 2, 2017
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2017 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 2, 2017
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Boss Jack G-10-283692Tunstill (Delaware)VTX Energy Operating, LLC100May 2017 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
823859-99DrillJagged Peak Energy LLCFeb 28, 2017Mar 8, 2017Apr 20, 20177,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-283692————

Formation tops

As filed on W-2/G-1. Subsea from 2,673 ft elevation.Download CSV →

FormationMD ftSubsea
Toborg8501,823
Soma1,3501,323
Rustler1,850823
Seven Rivers2,150523
Yates2,350323
Grayburg2,450223
Queen2,800-127
O'Brien3,050-377
Glorieta3,450-777
Tubb3,750-1,077

Perforations

Perforated and open-hole intervals.

FromToType
5,1957,000Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,45314.751,235 S
7.6257,5139.8751,035 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 23, 2024Apr 30, 2024—
00Apr 12, 2018Jan 23, 2018Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

2.66M
bbl, last 12 reported months
13.8M
bbl, all reported
Apr 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000115110H-1 InjectionActive30,0002,2504,500–7,500

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 2,664,344 · prior 12 2,390,843(+11%)

0200K400K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.