WELL · 42-375-31867 · DISTRICT 10

Bivins 15-34 #1H

Y

Potter County · Amarillo North (Canyon Lime) field · Shut IN  · Horizontal

Bivins 15-34 #1H (API 42-375-31867) is a horizontal well in Potter County operated by Presidio Petroleum LLC, completed June 5, 2017 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued January 25, 2017, permitted to 9,000 ft.

It was permitted by Le Norman Operating LLC and has since transferred to Presidio Petroleum LLC on the wellbore schedule.

Completion filings report 8 formation tops, including Red Cave, Brown Dolomite, Wolfcamp, Canyon.

Its lease has reported 56.3K barrels of oil and 97.9K mcf of gas since June 2017, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Presidio Petroleum LLC

Permitted by LE Norman Operating LLC; the EWA schedule now lists a different operator.

Based in
Canadian, TX
P-5 status
Active (A)
P-5 last filed
May 1, 2026
Permits on file
13
Phone
(806) 217-4483

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePresidio Petroleum LLC
Production reportsPresidio Petroleum LLCthrough Jun 2022
Latest permitLE Norman Operating LLCJan 25, 2017

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
1
permits on file
Jan 25, 2017
last permit issued
Jun 5, 2017
completed
56.3K
cumulative oil, bbl
97.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2017 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 5, 2017
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bivins 15-34 O-14-9592Amarillo, North (Canyon Lime)Presidio Petroleum LLC256.3K97.9KJun 2017 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1LE Norman Operating LLCJun 2017 → Jun 2019
  2. 2Templar Operating LLCJul 2019 → Dec 2019
  3. 3Presidio Petroleum LLCJan 2020 → Jun 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
822109-99DrillLE Norman Operating LLCJan 13, 2017Jan 25, 2017Apr 12, 20179,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-9592————

Formation tops

As filed on W-2/G-1. Subsea from 3,433 ft elevation.Download CSV →

FormationMD ftSubsea
Red Cave3,122311
Brown DolomiteBROWN DOLOMITE - H2S CORROSIVE4,083-650
Wolfcamp5,248-1,815
CanyonCANYON LIME7,029-3,596
Granite Wash7,475-4,042
Cliffside——
Ellenburger——
PennsylvanianPENN SAND——
Pennsylvanian——

Perforations

Perforated and open-hole intervals.

FromToType
7,64814,781Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,44312.252,060 S
77,6288.75340 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 19, 2018Feb 15, 2018Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37531867, documented in the API reference.