WELL · 42-413-31348 · DISTRICT 7
Helmers #3
Schleicher County · Vertical
Helmers #3 (API 42-413-31348) is a plugged well in Schleicher County, plugged October 12, 1983, last operated by Remuda Operating Company.
The RRC has issued 2 drilling permits between 1983 and 1991, permitted to 6,600 ft.
Completion filings report one formation top, including Canyon.
Its lease has reported 24.5K barrels of oil and 50.5K mcf of gas since January 1993, last reporting in August 2018. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Midland, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Apr 4, 2025
- Permits on file
- 214
- Phone
- (432) 684-8003
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Lavanco Energy, Ltd.through Mar 2018 |
| Latest permit | Remuda Operating CompanyJul 24, 1991 |
- 6,600
- total depth, ft
- 2
- permits on file
- Jul 24, 1991
- last permit issued
- —
- completed
- 24.5K
- cumulative oil, bbl
- 50.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Oct 12, 1983
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Helmers O-9-13091 | Kurland Bow Tye (Canyon Sand) | Lavanco Energy, Ltd. | 3 | 24.5K | 50.5K | Jan 1993 – Aug 2018 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Remuda Operating CompanyJan 1993 → May 2004
- 2Lavanco Energy, Inc.Jun 2004 → Feb 2006
- 3Lavanco Energy, Ltd.Mar 2006 → Mar 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 390113-99 | Reenter | Remuda Operating Company | Jul 22, 1991 | Jul 24, 1991 | Jul 23, 1991 | 5,100 |
| 214225-99 | Drill | High Plains Exploration, Inc. | Sep 20, 1983 | Sep 22, 1983 | Sep 30, 1983 | 6,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-13091 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,310 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| CanyonCANYON SAND | 4,929 | -2,619 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,929 | 4,932 | Perforated |
| 4,962 | 4,970 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 595 | 12.25 | 560 S |
| 4.5 | 5,126 | 7.875 | 488 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 21, 1991 | Oct 28, 1991 | Yes |
| 00 | Nov 19, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-413-31348 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-413-31348 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41331348, documented in the API reference.