WELL · 42-413-31592 · DISTRICT 7

Powell 1 #5

Plugged

Schleicher County · Phyllis Sonora (Canyon Upper) field  · Vertical

Powell 1 #5 (API 42-413-31592) is a plugged well in Schleicher County, plugged January 2, 2014, last operated by Byrd Operating Company.

The RRC has issued one drilling permit, issued February 27, 1986, permitted to 5,000 ft.

It was permitted by Staley Operating CO. and has since transferred to Byrd Operating Company on the wellbore schedule.

Completion filings report 5 formation tops, including Base Cretaceous (marker), Leonard, Clear Fork, Wolfcamp.

Operator of record

Byrd Operating Company

Permitted by Staley Operating Co.; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Aug 27, 2025
Permits on file
68
Phone
(432) 682-6523

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleByrd Operating Company
Production reportsStaley Operating Co.through Aug 1993
Latest permitStaley Operating Co.Feb 27, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,000
total depth, ft
1
permits on file
Feb 27, 1986
last permit issued
Apr 2, 1986
completed
0
cumulative oil, bbl
4.23K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2014

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 2, 1986
Shut in
—
Plugged
Jan 2, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Powell 1 G-9-121625Phyllis Sonora (Canyon, Upper)Byrd Operating Company104.23KJan 1993 – Jan 2014

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Staley Operating Co.Jan 1993 → Aug 1993

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
298626-99DrillStaley Operating Co.Feb 27, 1986Feb 27, 1986—5,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-121625————

Formation tops

As filed on W-2/G-1. Subsea from 2,391 ft elevation.Download CSV →

FormationMD ftSubsea
Base Cretaceous (marker)BASE CRETACEOUS7641,627
Leonard2,30091
Clear ForkCLEARFORK3,180-789
Wolfcamp3,653-1,262
CanyonUPPER CANYON SAND4,673-2,282

Perforations

Perforated and open-hole intervals.

FromToType
4,6754,849Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,21212.25750 S
4.55,2057.875750 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 22, 1986Jul 7, 1986Yes
00Jul 19, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41331592, documented in the API reference.