TEXAS · WELLS · SCHLEICHER COUNTY · API 42-413-31672 · DISTRICT 6E

Clayton-Hemphill East #1

Y

Schleicher County · Ozona NE. (Canyon Sand) field · Producing  · Vertical

Clayton-Hemphill East #1 (API 42-413-31672) is a well in Schleicher County operated by Zarvona Energy LLC, completed December 20, 1989 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1988 and 1990, permitted to 8,576 ft.

It was permitted by Thompson, J. Cleo and has since transferred to Zarvona Energy LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Wolfcamp, Canyon, Strawn, Detrital.

No lease production has been reported under this well’s leases.

Operator of record

Zarvona Energy LLC

Permitted by Thompson, J. Cleo; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jun 2, 2026
Permits on file
98
Phone
(713) 600-0600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleZarvona Energy LLC
Production reportsZarvona Energy LLCthrough Mar 2026
Latest permitThompson, J. CleoJan 10, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,576
total depth, ft
2
permits on file
Jan 10, 1990
last permit issued
Dec 20, 1989
completed
0
cumulative oil, bbl
115K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 20, 1989
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Clayton-Hemphill, East G-9-132968Ozona, NE. (Canyon Sand)Zarvona Energy LLC10115KJan 1993 – Jul 2026
— G-9-127245——000—

Gas, mcf lease total

Last 12 months 3,682 · prior 12 1,983(+86%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Thompson, J. CleoJan 1993 → Jun 2008
  2. 2Approach Operating LLCJul 2008 → Sep 2020
  3. 3Zarvona Energy LLCOct 2020 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
368369-99RecompletionThompson, J. CleoJan 8, 1990Jan 10, 1990—8,443
343257-99DrillThompson, J. CleoFeb 29, 1988Feb 26, 1988—9,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 20, 1989Clayton-Hemphill East G-9-132968Ozona NE. (Canyon Sand)Zarvona Energy LLCProducing8,576
Apr 23, 1988Clayton-Hemphill East G-9-127245Ozona N. E. (Ellenburger)Thompson J. CleoNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 2,436 ft elevation.Download CSV →

FormationMD ftSubsea
WolfcampBASE MID WOLFCAMP/LS5,706-3,270
Canyon8,204-5,768
Strawn8,362-5,926
Detrital8,412-5,976
Ellenburger8,488-6,052

Perforations

Perforated and open-hole intervals.

FromToType
8,2088,335Perforated
8,5158,542Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,52411600 S
4.58,5557.875450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 12, 1990Jan 8, 1990—
00Feb 1, 1990——
00Jun 22, 1988May 16, 1988Yes
00Jun 4, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41331672, documented in the API reference.