TEXAS · WELLS · SCHLEICHER COUNTY · WEST 'D' LEASE · API 42-413-31802 · DISTRICT 6E

West D #2

Y

Schleicher County · Cody Bell (Canyon) field · Producing  · Vertical

West D #2 (API 42-413-31802) is a well in Schleicher County operated by Txp Incorporated, completed November 25, 1992 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued August 3, 1992, permitted to 6,600 ft.

It was permitted by Texaco E & P Inc. and has since transferred to Txp Incorporated on the wellbore schedule.

Completion filings report 2 formation tops, including Coleman Junction, Canyon.

Its lease has reported 2.89K barrels of oil and 650K mcf of gas since January 1993, last reporting volume in April 2026.

Operator of record

TXP Incorporated

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

Based in
San Angelo, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 13, 2026
Permits on file
419
Phone
(325) 944-9894

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTXP Incorporated
Production reportsTXP, Incorporatedthrough Apr 2026
Latest permitTexaco E & P Inc.Aug 3, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,600
total depth, ft
1
permits on file
Aug 3, 1992
last permit issued
Nov 25, 1992
completed
2.89K
cumulative oil, bbl
650K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 25, 1992
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West 'D' G-9-143292Cody Bell (Canyon)TXP, Incorporated12.89K650KJan 1993 – Apr 2026

Gas, mcf lease total

Last 12 months 643 · prior 12 0

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Feb 1993 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Jul 2004
  3. 3XTO Energy Inc.Aug 2004 → Oct 2004
  4. 4Diamond S Energy CompanyNov 2004 → Apr 2022
  5. 5TXP, IncorporatedJan 2026 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
401752-99DrillTexaco E & P Inc.Jul 29, 1992Aug 3, 1992Oct 28, 19926,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 25, 1992West D G-9-143292Cody Bell (Canyon)TXP IncorporatedProducing6,600

Formation tops

As filed on W-2/G-1. Subsea from 2,378 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman Junction2,430-52
CanyonCANYON -A-5,925-3,547
CanyonCANYON -D-6,340-3,962

Perforations

Perforated and open-hole intervals.

FromToType
6,3406,430Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62570011350 S
4.56,6007.8751,900 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Feb 17, 1993Dec 18, 1992Yes
00Dec 31, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41331802, documented in the API reference.