WELL · 42-413-31803 · DISTRICT 7

West B #2

Y

Schleicher County · Cody Bell (Canyon) field · Producing  · Vertical

West B #2 (API 42-413-31803) is a well in Schleicher County operated by Txp Incorporated, completed January 15, 1996 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued August 3, 1992, permitted to 6,694 ft.

It was permitted by Texaco E & P Inc. and has since transferred to Txp Incorporated on the wellbore schedule.

Completion filings report 2 formation tops, including Coleman Junction, Canyon.

Its 2 leases have reported 8.4K barrels of oil and 431K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

TXP Incorporated

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

Based in
San Angelo, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 13, 2026
Permits on file
419
Phone
(325) 944-9894

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexaco E & P Inc.
Production reportsTXP, Incorporatedthrough Apr 2026
Latest permitTexaco E & P Inc.Aug 3, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,694
total depth, ft
2
permits on file
Aug 3, 1992
last permit issued
Jan 15, 1996
completed
8.4K
cumulative oil, bbl
431K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 15, 1996
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West "B" G-9-157239Cody Bell (Canyon)TXP, Incorporated10344KFeb 1996 – Jul 2026
West 'B' O-9-13353Cody Bell (Canyon)Texaco E & P Inc.28.4K86.8KJan 1993 – Apr 1996

Gas, mcf lease total

Last 12 months 3,639 · prior 12 1,570(+132%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Feb 1993 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Jul 2004
  3. 3XTO Energy Inc.Aug 2004 → Oct 2004
  4. 4Diamond S Energy CompanyNov 2004 → Sep 2025
  5. 5TXP, IncorporatedOct 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
401753-98DrillTexaco E & P Inc.Oct 12, 1992Aug 3, 1992Oct 15, 19926,700
401753-99DrillTexaco E & P Inc.Jul 29, 1992Aug 3, 1992—6,700

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 15, 1996West B G-9-157239Cody Bell (Canyon)TXP IncorporatedProducing6,694
Nov 9, 1992West B O-9-13353Cody Bell (Canyon)Texaco E & P Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 2,369 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman Junction2,260109
Canyon6,086-3,717
Canyon6,379-4,010

Perforations

Perforated and open-hole intervals.

FromToType
6,1176,140Perforated
6,2376,277Perforated
6,3796,412Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62570011375 S
4.56,6947.8751,950 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 8, 1996Feb 12, 1996—
00Mar 25, 1996——
00Dec 14, 1992Dec 4, 1992Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41331803, documented in the API reference.