TEXAS · WELLS · SCHLEICHER COUNTY · MIKA, JAMES LEASE · API 42-413-31822 · DISTRICT 6E
Mika James #2
Schleicher County · Cody Bell (Canyon) field · Vertical
Mika James #2 (API 42-413-31822) is a plugged well in Schleicher County, plugged June 5, 1993, last operated by Texaco E & P Inc..
The RRC has issued one drilling permit, issued October 14, 1992, permitted to 6,750 ft.
Completion filings report 3 formation tops, including San Angelo, Coleman Junction, Canyon.
Its lease has reported 44 barrels of oil and 3 mcf of gas since April 1993, with no volume in the three years through April 2026.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Jan 22, 2003
- Permits on file
- 3,332
- Phone
- (281) 561-3713
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Texaco E & P Inc. |
| Production reports | Texaco E & P Inc.through Jun 1993 |
| Latest permit | Texaco E & P Inc.Oct 14, 1992 |
- 6,750
- total depth, ft
- 1
- permits on file
- Oct 14, 1992
- last permit issued
- Apr 23, 1993
- completed
- 44
- cumulative oil, bbl
- 3
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 1993 THROUGH Jun 1993
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 23, 1993
- Shut in
- —
- Plugged
- Jun 5, 1993
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mika, James O-9-13436 | Cody Bell (Canyon) | Texaco E & P Inc. | 1 | 44 | 3 | Apr 1993 – Jun 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texaco E & P Inc.Apr 1993 → May 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 404525-99 | Drill | Texaco E & P Inc. | Oct 9, 1992 | Oct 14, 1992 | Dec 22, 1992 | 6,750 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 23, 1993 | Mika James O-9-13436 | Cody Bell (Canyon) | Texaco E & P Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,461 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San Angelo | 735 | 1,726 |
| Coleman Junction | 2,845 | -384 |
| Canyon | 6,547 | -4,086 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,547 | 6,592 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 785 | 11 | 450 S |
| 4.5 | 6,750 | 7.875 | 1,900 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 24, 1993 | May 5, 1993 | Yes |
| 00 | May 10, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-413-31822 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-413-31822 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41331822, documented in the API reference.