TEXAS · WELLS · SCHLEICHER COUNTY · LUEDECKE LEASE · API 42-413-31831 · DISTRICT 6E

Luedecke #3

Shut in

Schleicher County · Eldorado (Canyon) field · Temp Abandoned  · Vertical

Luedecke #3 (API 42-413-31831) is a well in Schleicher County operated by Hilcorp Energy Company, completed February 1, 1993 and listed as temp abandoned on the RRC schedule, shut in March 1, 2024.

The RRC has issued one drilling permit, issued November 23, 1992, permitted to 7,100 ft.

It was permitted by Enron Oil & Gas Company and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 6 formation tops, including Bae Cretaceous, Clear Fork, Base Wofcp Limestone, Canyon.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Enron Oil & Gas Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsOXY USA Inc.through Feb 2024
Latest permitEnron Oil & Gas CompanyNov 23, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,100
total depth, ft
1
permits on file
Nov 23, 1992
last permit issued
Feb 1, 1993
completed
0
cumulative oil, bbl
312K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 1, 1993
Shut in
Mar 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Luedecke G-9-144683Eldorado (Canyon)Hilcorp Energy Company10312KFeb 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

0204060202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enron Oil & Gas CompanyFeb 1993 → Sep 1999
  2. 2EOG Resources, Inc.Oct 1999 → Oct 1999
  3. 3TXP, IncorporatedNov 1999 → Dec 2003
  4. 4Pogo Producing CompanyJan 2004 → Jan 2008
  5. 5Pogo Producing Company LLCFeb 2008 → Feb 2008
  6. 6OXY USA Inc.Apr 2008 → Feb 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
406159-99DrillEnron Oil & Gas CompanyNov 16, 1992Nov 23, 1992Dec 31, 19927,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 1, 1993Luedecke G-9-144683Eldorado (Canyon)Hilcorp Energy CompanyTemp Abandoned · shut in Mar 1, 20247,100

Formation tops

As filed on W-2/G-1. Subsea from 2,448 ft elevation.Download CSV →

FormationMD ftSubsea
Bae Cretaceous8501,598
Clear ForkCLEARFORK2,808-360
Base Wofcp Limestone4,917-2,469
Canyon5,550-3,102
Black Shale Marker6,580-4,132
Strawn6,960-4,512

Perforations

Perforated and open-hole intervals.

FromToType
6,1866,192Perforated
6,4306,451Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1440——
8.6251,08911250 S
4.57,0987.875450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 12, 1993Mar 8, 1993Yes
00Apr 8, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41331831, documented in the API reference.