TEXAS · WELLS · SCHLEICHER COUNTY · MCWHORTER, V. M. LEASE · API 42-413-31892 · DISTRICT 6E

McWhorter V. M. #6

Y

Schleicher County · Eldorado (Canyon) field · Producing  · Vertical

Mcwhorter V. M. #6 (API 42-413-31892) is a well in Schleicher County operated by Txp Incorporated, completed October 24, 1994 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits (amended once) between 1994 and 2001, permitted to 7,000 ft.

It was permitted by Texaco E & P Inc. and has since transferred to Txp Incorporated on the wellbore schedule.

Completion filings report 4 formation tops, including Wolfcamp, Cisco, Canyon, Strawn.

No lease production has been reported under this well’s leases.

Operator of record

TXP Incorporated

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

Based in
San Angelo, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 13, 2026
Permits on file
419
Phone
(325) 944-9894

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsTXP, Incorporatedthrough Apr 2026
Latest permitTexaco E & P Inc.Oct 25, 2001
7,000
total depth, ft
3
permits on file
Oct 25, 2001
last permit issued
Oct 24, 1994
completed
0
cumulative oil, bbl
363K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1994 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 24, 1994
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McWhorter, V. M. G-9-151945Eldorado (Canyon)TXP, Incorporated10363KOct 1994 – Jul 2026

Gas, mcf lease total

Last 12 months 3,456 · prior 12 742(+366%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Oct 1994 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Jul 2004
  3. 3XTO Energy Inc.Aug 2004 → Feb 2005
  4. 4Diamond S Energy CompanyMar 2005 → Aug 2025
  5. 5TXP, IncorporatedJan 2026 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
514737-99RecompletionTexaco E & P Inc.Oct 25, 2001Oct 25, 2001—7,000
425519-98DrillTexaco E & P Inc.Aug 16, 1994Jul 7, 1994Aug 17, 19947,000
425519-99DrillTexaco E & P Inc.Jul 1, 1994Jul 7, 1994—7,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 24, 1994McWhorter V. M. G-9-151945Eldorado (Canyon)TXP IncorporatedProducing7,000

Formation tops

As filed on W-2/G-1. Subsea from 2,438 ft elevation.Download CSV →

FormationMD ftSubsea
WolfcampWOLFCAMP LIME4,675-2,237
Cisco5,385-2,947
CanyonCANYON A5,805-3,367
CanyonCANYON B5,930-3,492
CanyonCANYON D6,180-3,742
Strawn6,815-4,377

Perforations

Perforated and open-hole intervals.

FromToType
6,1216,316Perforated
6,6086,775Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62571511510 S
4.57,0007.8751,665 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 6, 1995Nov 23, 1994Yes
00Dec 14, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41331892, documented in the API reference.