TEXAS · WELLS · SCHLEICHER COUNTY · API 42-413-32395 · DISTRICT 6E
McGregor Unit #4
Schleicher County · Fort McKavitt (Lime 4150) field · Shut In · Vertical
Mcgregor Unit #4 (API 42-413-32395) is a well in Schleicher County operated by R3 Operating Corporation, completed May 1, 2015 and listed as shut in on the RRC schedule, shut in May 1, 2017.
The RRC has issued one drilling permit, issued August 31, 2006, permitted to 4,317 ft.
It was permitted by Telesis Operating CO., Inc. and has since transferred to R3 Operating Corporation on the wellbore schedule.
Completion filings report 10 formation tops, including Coleman Junction, Canyon, Home Creek, Strawn.
Its 3 leases have reported 215K barrels of oil and 618K mcf of gas since December 2006, last reporting in July 2026. The leases carry 61 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Telesis Operating Co., Inc.; the EWA schedule now lists a different operator.
- Based in
- Greenwood VLG, CO
- P-5 status
- Active (A)
- P-5 last filed
- Sep 15, 2025
- Phone
- (720) 388-8270
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | R3 Operating Corporation |
| Production reports | R3 Operating Corporationthrough Apr 2026 |
| Latest permit | Telesis Operating Co., Inc.Aug 31, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,317
- total depth, ft
- 1
- permits on file
- Aug 31, 2006
- last permit issued
- May 1, 2015
- completed
- 215K
- cumulative oil, bbl
- 618K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 1, 2015
- Shut in
- May 1, 2017
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 61 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McGregor Unit O-9-19114 | Fort McKavitt (Lime 4150) | R3 Operating Corporation | 59 | 215K | 393K | May 2015 – Jul 2026 |
| McGregor -3- C G-9-225133 | Fort McKavitt (Lime 4150) | Boaz Energy II Operating, LLC | 1 | 0 | 225K | Dec 2006 – Jan 2016 |
| McGregor -3- C O-9-19104 | Fort McKavitt (Lime 4150) | Boaz Energy II Operating, LLC | 1 | 0 | 0 | May 2015 – Dec 2015 |
Oil, barrels lease total
Last 12 months 3,859 · prior 12 12,183(-68%)
Gas, mcf lease total
Last 12 months 4,097 · prior 12 16,466(-75%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Telesis Operating Co., Inc.Dec 2006 → Dec 2013
- 2Boaz Energy II Operating, LLCJan 2014 → Mar 2025
- 3T2 Operating CorporationApr 2025 → Jul 2025
- 4R3 Operating CorporationAug 2025 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 625256-99 | Drill | Telesis Operating Co., Inc. | Aug 30, 2006 | Aug 31, 2006 | Sep 11, 2006 | 4,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 1, 2015 | McGregor Unit O-9-19114 | Fort McKavitt (Lime 4150) | R3 Operating Corporation | Shut In · shut in May 1, 2017 | 4,317 |
| Jan 5, 2007 | McGregor -3- C G-9-225133 | Fort McKavitt (Lime 4150) | Boaz Energy II Operating LLC | Not on Schedule | — |
| — | McGregor -3- C O-9-19104 | Fort McKavitt (Lime 4150) | Boaz Energy II Operating LLC | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,315 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman JunctionCOLEMAN JUNCTION - NORTHERN HALF | 2,362 | -47 |
| Canyon | 3,650 | -1,335 |
| Home Creek | 3,650 | -1,335 |
| Strawn | 3,859 | -1,544 |
| Palo PintoPALO PINTO LIME | 3,860 | -1,545 |
| Fort Mc Kavitt Sd. | 4,060 | -1,745 |
| Clear ForkCLEARFORK | — | — |
| Ellenburger | — | — |
| San AngeloSAN ANGELO - 20 MILES NORTHWEST | — | — |
| Wolfcamp | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,141 | 4,151 | Perforated |
| 4,166 | 4,172 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 521 | 12.25 | 525 S |
| 4.5 | 4,313 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 11, 2015 | — | — |
| 00 | Dec 2, 2015 | Oct 13, 2015 | — |
| 00 | Dec 2, 2015 | — | — |
| 00 | May 9, 2007 | Jan 25, 2007 | Yes |
| 00 | Mar 8, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-413-32395 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-413-32395 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41332395, documented in the API reference.