TEXAS · WELLS · SCURRY COUNTY · API 42-415-04093 · DISTRICT 7B

Fuller P. L. NCT-1 #249

Plugged

Scurry County · Fuller East (Strawn -C-) field  · Vertical

Fuller P. L. Nct-1 #249 (API 42-415-04093) is a plugged well in Scurry County, plugged August 23, 2019, last operated by Apache Corporation.

The RRC has issued 2 drilling permits between 1984 and 1999, permitted to 7,425 ft.

Completion filings report 3 formation tops, including San Andres, Wolfcamp, Canyon.

Its 2 leases have reported 405K barrels of oil and 202K mcf of gas since January 1993, last reporting in July 2026. The leases carry 13 wells, so these are lease totals, not this well alone.

Operator of record

Apache Corporation

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Dec 3, 2025
Permits on file
9,756
Phone
(713) 954-5500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleApache Corporation
Production reportsCrossroads Operating, LLCthrough Apr 2026
Latest permitApache CorporationMar 25, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,425
total depth, ft
2
permits on file
Mar 25, 1999
last permit issued
Mar 4, 1997
completed
405K
cumulative oil, bbl
202K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 4, 1997
Shut in
—
Plugged
Aug 23, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 13 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Fuller, P. L. NCT-1 O-11-16424Fuller, East (Canyon)Crossroads Operating, LLC11396K199KJan 1993 – Jul 2026
Fuller, P. L. NCT-1 O-11-15662Fuller, East (Strawn -C-)Apache Corporation28.25K2.38KJan 1993 – Jul 1999

Oil, barrels lease total

Last 12 months 6,472 · prior 12 6,831(-5%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Feb 1995
  2. 2Apache CorporationMar 1995 → Feb 2020
  3. 3Crossroads Operating, LLCMar 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
483439-99Field transferApache CorporationMar 23, 1999Mar 25, 1999Feb 10, 19977,290
251212-99RecompletionTexaco Inc.Oct 30, 1984Sep 12, 1984—7,425

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 4, 1997Fuller P. L. NCT-1 O-11-15662Fuller East (Strawn -C-)Apache CorporationPlugged—
Mar 4, 1997Fuller P. L. NCT-1 O-11-16424Fuller East (Canyon)Crossroads Operating LLCPlugged—
Jan 13, 1972Fuller P. L. NCT-1 O-11-16134Fuller East (Fuller -B-)Crossroads Operating LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,270 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres1,600670
Wolfcamp4,900-2,630
Canyon6,860-4,590

Perforations

Perforated and open-hole intervals.

FromToType
6,8726,940Perforated
7,2907,300Perforated
7,3167,326Perforated
—4,946Perforated
—7,326Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,46012.25700 S
9.6251,46012.5700 S
7.6257,4459.25650 S
77,4608.75650 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 7, 2002Sep 15, 1997—
00Aug 4, 1999Jun 14, 1999—
00Jun 14, 1999——
00Nov 28, 1984Oct 12, 1984—
00Jan 12, 1984Jan 18, 1972—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
1.79M
bbl, all reported
Jun 2020
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000085825H-1 InjectionPlugged Aug 28, 20194,0003,2506,835–7,000

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120192020

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41504093, documented in the API reference.