TEXAS · WELLS · SCURRY COUNTY · API 42-415-31886 · DISTRICT 7B
Fuller P. L. NCT-1 #349
Scurry County · Kelly-Snyder (Cisco Sand) field · Vertical
Fuller P. L. Nct-1 #349 (API 42-415-31886) is a plugged well in Scurry County, plugged December 20, 2002, last operated by Occidental Permian Ltd..
The RRC has issued one drilling permit, issued April 13, 1981, permitted to 6,945 ft.
It was permitted by Texaco Inc. and has since transferred to Occidental Permian Ltd. on the wellbore schedule.
Completion filings report 3 formation tops, including San Andres, Wolfcamp, Canyon.
Its 2 leases have reported 30.4K barrels of oil and 122K mcf of gas since January 1993, last reporting in July 2026. The leases carry 15 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Texaco Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 2, 2026
- Permits on file
- 6,251
- Phone
- (713) 215-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Crossroads Operating LLC |
| Production reports | Apache Corporationthrough Feb 2010 |
| Latest permit | Texaco Inc.Apr 13, 1981 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,945
- total depth, ft
- 1
- permits on file
- Apr 13, 1981
- last permit issued
- Jun 6, 1997
- completed
- 30.4K
- cumulative oil, bbl
- 122K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 6, 1997
- Shut in
- —
- Plugged
- Dec 20, 2002
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 15 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Fuller, P. L. NCT-1 O-11-3165 | Kelly-Snyder (Cisco Sand) | Crossroads Operating, LLC | 14 | 30.4K | 122K | Jan 1993 – Jul 2026 |
| Fuller, P. L. NCT-1 O-11-67882 | Kelly-Snyder (Cisco Sand) | Occidental Permian Ltd. | 1 | 0 | 0 | Jan 1998 – Jan 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texaco E & P Inc.Jan 1993 → Feb 1995
- 2Apache CorporationMar 1995 → Dec 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 114837-99 | Drill | Texaco Inc. | Apr 13, 1981 | Apr 13, 1981 | Jun 22, 1981 | 6,945 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 6, 1997 | Fuller P. L. NCT-1 O-11-3165 | Kelly-Snyder (Cisco Sand) | Crossroads Operating LLC | Plugged | — |
| Jun 6, 1997 | Fuller P. L. NCT-1 O-11-67882 | Kelly-Snyder (Cisco Sand) | Occidental Permian Ltd. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,440 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San Andres | 1,600 | 840 |
| Wolfcamp | 4,900 | -2,460 |
| Canyon | 6,860 | -4,420 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,190 | 4,218 | Perforated |
| 4,268 | 4,288 | Perforated |
| 4,530 | 4,595 | Perforated |
| 6,108 | 6,118 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,763 | 11 | 1,850 S |
| 2.375 | 6,000 | — | — |
| 5.5 | 6,961 | 7.875 | 1,600 S |
| 5.5 | 6,974 | 7.875 | 1,600 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 12, 1998 | Sep 15, 1997 | — |
| 00 | Dec 5, 1997 | Sep 15, 1997 | — |
| 00 | Jan 12, 1984 | Aug 7, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-415-31886 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-415-31886 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 38.4K
- bbl, last 12 reported months
- 511K
- bbl, all reported
- Jun 2002
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000085903 | W-14 Disposal | Plugged Jan 13, 2003 | 8,000 | 1,800 | 3,800–4,600 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 38,444 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41531886, documented in the API reference.