TEXAS · WELLS · SCURRY COUNTY · API 42-415-33808 · DISTRICT 7B

Neely 129 #1

Plugged

Scurry County · Gill (Penn. Reef 6900) field  · Vertical

Neely 129 #1 (API 42-415-33808) is a plugged well in Scurry County, plugged June 3, 2024, last operated by Sharp Image Energy Inc..

The RRC has issued one drilling permit (amended once), issued August 21, 2000, permitted to 7,500 ft.

Completion filings report 4 formation tops, including Wolfcamp, Cisco, Canyon, Pennsylvanian.

Its 2 leases have reported 281K barrels of oil and 252K mcf of gas since November 2000, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Sharp Image Energy Inc.

Based in
Big Spring, TX
P-5 status
Active (A)
P-5 last filed
Jul 16, 2026
Permits on file
665
Phone
(432) 267-3126

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSharp Image Energy Inc.
Production reportsSharp Image Energy, Inc.through Jul 2023
Latest permitSharp Image Energy, Inc.Aug 21, 2000
7,500
total depth, ft
2
permits on file
Aug 21, 2000
last permit issued
Sep 13, 2001
completed
281K
cumulative oil, bbl
252K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2000 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 13, 2001
Shut in
—
Plugged
Jun 3, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Neely 129 O-11-68272Gill (Penn. Reef 6900)Sharp Image Energy, Inc.2270K249KNov 2000 – Jul 2026
Neely 129 O-11-68279Hatfield, Zachary (Wolfcamp)Sharp Image Energy, Inc.210.4K2.84KDec 2000 – Nov 2001

Oil, barrels lease total

Last 12 months 0 · prior 12 0

024202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sharp Image Energy, Inc.Nov 2000 → Jul 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
498707-98DrillSharp Image Energy, Inc.Feb 1, 2001Aug 21, 2000—7,500
498707-99DrillSharp Image Energy, Inc.Aug 21, 2000Aug 21, 2000Oct 19, 20007,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 13, 2001Neely 129 O-11-68272Gill (Penn. Reef 6900)Sharp Image Energy Inc.Plugged—
Nov 18, 2000Neely 129 O-11-68279Hatfield Zachary (Wolfcamp)Sharp Image Energy Inc.Plugged—
Nov 18, 2000Neely 129 O-11-68272Gill (Penn. Reef 6900)Sharp Image Energy Inc.Plugged—
—Neely 129 O-11-68279Hatfield Zachary (Wolfcamp)Sharp Image Energy Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,267 ft elevation.Download CSV →

FormationMD ftSubsea
Wolfcamp4,799-2,532
Cisco5,390-3,123
CanyonCANYON LIME6,988-4,721
PennsylvanianPENN REEF7,096-4,829

Perforations

Perforated and open-hole intervals.

FromToType
5,3585,361Perforated
7,0967,099Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,847111,000 S
5.57,1307.8751,130 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 12, 2001Oct 10, 2001—
00Jun 29, 2001Jan 17, 2001—
00Jun 19, 2001Jan 17, 2001Yes
00Apr 30, 2001—Yes
00Mar 29, 2001——
00Mar 9, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41533808, documented in the API reference.