WELL · 42-415-34366 · DISTRICT 8
Ernest E #7H
Scurry County · Horizontal
Ernest E #7H (API 42-415-34366) is a permitted horizontal well in Scurry County filed by King Operating Corporation; no completion report is on file yet.
The RRC has issued 2 drilling permits (amended twice) between 2007 and 2015, permitted to 7,000 ft.
Completion filings report 3 formation tops, including Strawn, Wolfcamp, Canyon.
Its lease has reported 54.9K barrels of oil and 121K mcf of gas since March 2008, last reporting in July 2026.
Operator of record
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Sep 30, 2025
- Permits on file
- 180
- Phone
- (817) 865-3558
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | North Fork Operating LPthrough Apr 2026 |
| Latest permit | King Operating CorporationOct 21, 2015 |
- 7,000
- total depth, ft
- 4
- permits on file
- Oct 21, 2015
- last permit issued
- —
- completed
- 54.9K
- cumulative oil, bbl
- 121K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2008 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Earnest "E" O-11-69446 | Mirage (Strawn) | North Fork Operating LP | 1 | 54.9K | 121K | Mar 2008 – Jul 2026 |
Oil, barrels lease total
Last 12 months 1,091 · prior 12 1,751(-38%)
Gas, mcf lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1King Operating CorporationApr 2008 → Dec 2019
- 2Strawn Petroleum Operating, LLCJan 2020 → Apr 2024
- 3North Fork Operating LPMay 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 811277-98 | Recompletion | King Operating Corporation | Jan 12, 2016 | Oct 21, 2015 | — | 7,000 |
| 811277-99 | Recompletion | King Operating Corporation | Oct 16, 2015 | Oct 21, 2015 | — | 7,000 |
| 650673-98 | Drill | King Operating Corporation | Nov 10, 2009 | Dec 11, 2007 | Dec 11, 2007 | 7,000 |
| 650673-99 | Drill | King Operating Corporation | Dec 4, 2007 | Dec 11, 2007 | Dec 11, 2007 | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-69446 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,393 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,191 | 8,485 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,699 | 12.25 | 1,020 S |
| 7 | 6,600 | 8.75 | 570 S |
| 4.5 | 8,485 | 6.125 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 8, 2010 | Apr 1, 2009 | Yes |
| 00 | Nov 23, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-415-34366 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-415-34366 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41534366, documented in the API reference.