TEXAS · WELLS · SCURRY COUNTY · CRISSWELL LEASE · API 42-415-34564 · DISTRICT 7B

Crisswell #1

Plugged

Scurry County · Church Peak (Glorieta) field  · Vertical

Crisswell #1 (API 42-415-34564) is a plugged well in Scurry County, plugged November 24, 2014, last operated by L.C.S. Production Company.

The RRC has issued one drilling permit, issued November 17, 2009, permitted to 7,500 ft.

It was permitted by Plantation Operating, LLC and has since transferred to L.C.S. Production Company on the wellbore schedule.

Completion filings report one formation top, including Glorieta.

Its lease has reported 182 barrels of oil since January 2010, last reporting in June 2015.

Operator of record

L.C.S. Production Company

Permitted by Plantation Operating, LLC; the EWA schedule now lists a different operator.

Based in
Abilene, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 14, 2026
Permits on file
1,707
Phone
(325) 692-3903

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleL.C.S. Production Company
Production reportsL.C.S. Production Companythrough May 2010
Latest permitPlantation Operating, LLCNov 17, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,500
total depth, ft
1
permits on file
Nov 17, 2009
last permit issued
Jan 19, 2010
completed
182
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2010 THROUGH Jun 2015

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 19, 2010
Shut in
—
Plugged
Nov 24, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Crisswell O-11-69531Church Peak (Glorieta)L.C.S. Production Company11820Jan 2010 – Jun 2015

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Plantation Operating, LLCJan 2010 → Apr 2010
  2. 2L.C.S. Production CompanyMay 2010 → May 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
687264-99DrillPlantation Operating, LLCNov 11, 2009Nov 17, 2009Dec 1, 20097,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 19, 2010Crisswell O-11-69531Church Peak (Glorieta)L.C.S. Production CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,175 ft elevation.Download CSV →

FormationMD ftSubsea
GlorietaGLORIETA (DOLOMITE)1,527648

Perforations

Perforated and open-hole intervals.

FromToType
1,7931,803Perforated
1,8081,810Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37527417.5300 S
8.6252,08711600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 25, 2010Feb 26, 2010Yes
00Jun 1, 2010——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Jun 2014
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000103419H-1 InjectionPlugged Dec 18, 20142,0008901,785–2,006

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120132014

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41534564, documented in the API reference.