WELL · 42-415-35488 · DISTRICT 8
Willingham A #8701H
Scurry County · Garden City S. (Wolfcamp) field · Producing · Horizontal
Willingham A #8701H (API 42-415-35488) is a horizontal well in Scurry County operated by Walsh & Watts Inc., completed January 17, 2020 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended twice), issued August 22, 2019, permitted to 7,700 ft.
It was permitted by Peregrine Petroleum Prtnr, Ltd. and has since transferred to Walsh & Watts Inc. on the wellbore schedule.
Completion filings report 9 formation tops, including Clear Fork, Wolfcamp, Coleman Junction, Fuller Sand.
Its lease has reported 984K barrels of oil and 2.52M mcf of gas since January 2020, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Peregrine Petroleum Prtnr, Ltd.; the EWA schedule now lists a different operator.
Aledo, TX · P-5 Y, filed Sep 4, 2025 · 361 permits on file · (855) 229-2122
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Walsh & Watts Inc. |
| Production reports | Walsh & Watts, Inc.through Apr 2026 |
| Latest permit | Peregrine Petroleum Prtnr, Ltd.Aug 22, 2019 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,700
- total depth, ft
- 3
- permits on file
- Aug 22, 2019
- last permit issued
- Jan 17, 2020
- completed
- 984K
- cumulative oil, bbl
- 2.52M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2020 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 17, 2020
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
32.700375, -100.662002
OpenStreetMap → · Google Maps →
Permit surface location from the RRC GIS record, in Scurry County.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Willingham A O-10-54260 | Garden City, S. (Wolfcamp) | Walsh & Watts, Inc. | 3 | 984K | 2.52M | Jan 2020 – Jul 2026 |
Gas, mcf lease total
Last 12 months 291,598 · prior 12 343,657(-15%)
Oil, barrels lease total
Last 12 months 36,103 · prior 12 53,135(-32%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Peregrine Petroleum Prtnr, Ltd.Jan 2020 → Feb 2024
- 2Walsh & Watts, Inc.Mar 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 856374-97 | Drill | Peregrine Petroleum Prtnr, Ltd. | Sep 24, 2019 | Aug 22, 2019 | Aug 31, 2019 | 6,830 |
| 856374-98 | Drill | Peregrine Petroleum Prtnr, Ltd. | Sep 5, 2019 | Aug 22, 2019 | Aug 31, 2019 | 7,700 |
| 856374-99 | Drill | Peregrine Petroleum Prtnr, Ltd. | Aug 19, 2019 | Aug 22, 2019 | Aug 31, 2019 | 7,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-54260 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,173 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Clear ForkCLEARFORK | 1,694 | 479 |
| Wolfcamp | 3,548 | -1,375 |
| Coleman JunctionCOLEMAN JUNCTION - POSSIBLE LOST | — | — |
| Fuller Sand | — | — |
| Glorieta | — | — |
| San AndresSAN ANDRES - HIGH FLOWS, H2S, CO | — | — |
| Spraberry | — | — |
| Wichita-AlbanyWICHITA | — | — |
| Wichita-AlbanyWICHITA ALBANY - OVER PRESSURED | — | — |
| YatesYATES - HIGH FLUIDS AND/OR GAS F | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,110 | 14,050 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 451 | 12.25 | 260 S |
| 7 | 7,100 | 8.75 | 990 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 10, 2020 | Mar 31, 2020 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-415-35488 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-415-35488 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Nearby wells and their tops
NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM
Draw a cross-section
This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.
Bobbie Unit42-415-35576
0.1 KM · Peregrine Petroleum Prtnr, Ltd. · Section with this well →
| Wolfcamp | 3,555 | -1,381 |
| Coleman Junction | 3,910 | -1,736 |
| San Andres | — | |
| Mississippian | — | |
| Glorieta | — | |
| Fuller Sand | — | |
| Ellenburger | — | |
| Clear Fork | — |
13 TOPS · FIRST 8
Willingham A42-151-33145
0.7 KM · Peregrine Petroleum Prtnr, Ltd. · Section with this well →
| Cisco | 6,429 | -4,260 |
| Breckenridge - Disposal | — | |
| Coleman Junction | — | |
| Crystal Falls - Disposal | — | |
| Dothan Sand - Disposal | — | |
| Flippen - Disposal | — | |
| Hope - Disposal | — | |
| Noodle Creek - Disposal | — |
11 TOPS · FIRST 8
Willingham A42-415-35555
0.7 KM · Peregrine Petroleum Prtnr, Ltd. · Section with this well →
| Coleman Junction | 3,927 | -1,747 |
| Cisco | 5,633 | -3,453 |
| Canyon | 5,823 | -3,643 |
| Strawn | 6,699 | -4,519 |
| Yates | — | |
| Clear Fork | — | |
| Fuller Sand | — | |
| Glorieta | — |
13 TOPS · FIRST 8
Madge Unit42-415-35556
0.7 KM · Peregrine Petroleum Prtnr, Ltd. · Section with this well →
| Coleman Junction | 3,929 | -1,748 |
| Cisco | 5,160 | -2,979 |
| Wolfcamp | — | |
| Wichita-Albany | — | |
| Wichita-Albany | — | |
| Fuller Sand | — | |
| San Andres | — | |
| Glorieta | — |
11 TOPS · FIRST 8
Strawberry 8742-415-35539
0.8 KM · Peregrine Petroleum Prtnr, Ltd. · Section with this well →
| Coleman Junction | 3,985 | -1,722 |
| Cisco | 5,631 | -3,368 |
| Wolfcamp | — | |
| Yates | — | |
| Wichita-Albany | — | |
| Glorieta | — | |
| Spraberry | — | |
| Wichita-Albany | — |
11 TOPS · FIRST 8
Tomahawk E 88-6542-415-35569
1.3 KM · Browning Oil Company, Inc. · Section with this well →
| Wichita-Albany | 2,855 | -619 |
| Coleman Junction | 3,670 | -1,434 |
| Wolfcamp | 5,980 | -3,744 |
| Glorieta | — | |
| Yates | — | |
| Wichita-Albany | — | |
| Spraberry | — | |
| Clear Fork | — |
10 TOPS · FIRST 8
Ribeye E 8842-415-35568
1.3 KM · Browning Oil Company, Inc. · Section with this well →
| Wichita-Albany | 2,855 | -617 |
| Coleman Junction | 3,670 | -1,432 |
| Clear Fork | — | |
| San Andres | — | |
| Glorieta | — | |
| Wichita-Albany | — | |
| Spraberry | — | |
| Fuller Sand | — |
10 TOPS · FIRST 8
Lindsey Loo Unit42-151-33193
1.5 KM · Peregrine Petroleum Prtnr, Ltd. · Section with this well →
| Coleman Junction | 3,909 | -1,662 |
| Noodle Creek - Disposal | 4,266 | -2,019 |
| Hope - Disposal | — | |
| Flippen - Disposal | — | |
| San Andres | — | |
| Saddle Creek | — | |
| Breckenridge - Disposal | — | |
| Cisco | — |
10 TOPS · FIRST 8
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41535488, documented in the API reference.