TEXAS · WELLS · SHERMAN COUNTY · JUDD, F.A. LEASE · API 42-421-30749 · DISTRICT 08

Judd F.A. #2214

Shut in

Sherman County · Texas Hugoton field · Temp Abandoned  · Vertical

Judd F.A. #2214 (API 42-421-30749) is a well in Sherman County operated by Pantera Energy Company, completed July 31, 2000 and listed as temp abandoned on the RRC schedule, shut in July 1, 2023.

The RRC has issued one drilling permit (amended once), issued May 10, 2000, permitted to 3,300 ft.

It was permitted by BP America Production Company and has since transferred to Pantera Energy Company on the wellbore schedule.

Completion filings report 4 formation tops, including Glorieta, Panhandle Lime, Brown Dolomite, T.D..

Its lease has reported 96.8K mcf of gas since July 2000, last reporting volume in June 2023.

Operator of record

Pantera Energy Company

Permitted by BP America Production Company; the EWA schedule now lists a different operator.

Based in
Amarillo, TX
P-5 status
Active (A)
P-5 last filed
Oct 1, 2025
Permits on file
359
Phone
(806) 376-6625

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePantera Energy Company
Production reportsPantera Energy Companythrough Jun 2023
Latest permitBP America Production CompanyMay 10, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,300
total depth, ft
2
permits on file
May 10, 2000
last permit issued
Jul 31, 2000
completed
0
cumulative oil, bbl
96.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2000 THROUGH Jun 2023

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 31, 2000
Shut in
Jul 1, 2023
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Judd, F.A. G-14-178814Texas HugotonPantera Energy Company1096.8KJul 2000 – Jun 2023

Gas, mcf lease total

Last 12 months 0 · prior 12 0

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Amoco Production CompanyJul 2000 → Dec 2001
  2. 2BP America Production CompanyJan 2002 → Sep 2014
  3. 3Pantera Energy CompanyOct 2014 → Jun 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
494791-98DrillBP America Production CompanyApr 10, 2007May 10, 2000Jun 21, 20003,300
494791-99DrillAmoco Production CompanyMay 8, 2000May 10, 2000Jun 21, 20003,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 31, 2000Judd F.A. G-14-178814Texas HugotonPantera Energy CompanyTemp Abandoned · shut in Jul 1, 20233,300

Formation tops

As filed on W-2/G-1. Subsea from 3,564 ft elevation.Download CSV →

FormationMD ftSubsea
Glorieta1,0902,474
Panhandle Lime2,570994
Brown Dolomite2,690874
T.D.2,800764

Perforations

Perforated and open-hole intervals.

FromToType
2,7553,024Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62556212.25280 S
5.52,7547.87585 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 1, 2000Sep 22, 2000Yes
00Oct 10, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42130749, documented in the API reference.