TEXAS · WELLS · SHERMAN COUNTY · CARTER ET AL "A" LEASE · API 42-421-30753 · DISTRICT 08

Carter et al A #2206

Plugged

Sherman County · Texas Hugoton field  · Vertical

Carter ET AL A #2206 (API 42-421-30753) is a plugged well in Sherman County, plugged June 30, 2026, last operated by Pantera Energy Company.

The RRC has issued one drilling permit (amended once), issued May 10, 2000, permitted to 3,300 ft.

It was permitted by BP America Production Company and has since transferred to Pantera Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Glorieta, Panhandle, Brown Dolomite.

Its lease has reported 19.8K mcf of gas since July 2000, with no volume in the three years through April 2026.

Operator of record

Pantera Energy Company

Permitted by BP America Production Company; the EWA schedule now lists a different operator.

Based in
Amarillo, TX
P-5 status
Active (A)
P-5 last filed
Oct 1, 2025
Permits on file
359
Phone
(806) 376-6625

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePantera Energy Company
Production reportsPantera Energy Companythrough Jan 2003
Latest permitBP America Production CompanyMay 10, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,300
total depth, ft
2
permits on file
May 10, 2000
last permit issued
Jul 31, 2000
completed
0
cumulative oil, bbl
19.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2000 THROUGH Jan 2003

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 31, 2000
Shut in
—
Plugged
Jun 30, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Carter et al "A" G-14-178796Texas HugotonPantera Energy Company1019.8KJul 2000 – Jan 2003

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Amoco Production CompanyAug 2000 → Dec 2001
  2. 2BP America Production CompanyJan 2002 → Jan 2003

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
494809-98DrillBP America Production CompanySep 21, 2011May 10, 2000Jun 16, 20003,300
494809-99DrillAmoco Production CompanyMay 8, 2000May 10, 2000Jun 16, 20003,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 31, 2000Carter et al A G-14-178796Texas HugotonPantera Energy CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 3,524 ft elevation.Download CSV →

FormationMD ftSubsea
Glorieta1,1112,413
Panhandle2,600924
Brown Dolomite2,804720

Perforations

Perforated and open-hole intervals.

FromToType
2,7603,024Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62556212.25300 S
5.52,7627.87585 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 1, 2000Sep 25, 2000Yes
00Oct 10, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42130753, documented in the API reference.