WELL · 42-431-32032 · DISTRICT 8

Hildebrand #6510

N

Sterling County · Conger (Penn) field  · Vertical

Hildebrand #6510 (API 42-431-32032) is a well in Sterling County operated by Wagner & Brown Ltd., completed February 2, 1990.

The RRC has issued one drilling permit, issued September 25, 1989, permitted to 9,750 ft.

It was permitted by Wagner & Brown and has since transferred to Wagner & Brown Ltd. on the wellbore schedule.

Completion filings report 5 formation tops, including Wolfcamp, Cisco, Canyon, Strawn.

Its 2 leases have reported 1M barrels of oil and 35.2M mcf of gas since January 1993, last reporting in July 2026. The leases carry 126 wells, so these are lease totals, not this well alone.

Operator of record

Wagner & Brown Ltd.

Permitted by Wagner & Brown; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Inactive (I)
P-5 last filed
Sep 25, 2013
Permits on file
298
Phone
(432) 682-7936

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWagner & Brown Ltd.
Production reportsBurk Royalty Co., Ltd.through Apr 2026
Latest permitWagner & BrownSep 25, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,750
total depth, ft
1
permits on file
Sep 25, 1989
last permit issued
Feb 2, 1990
completed
1M
cumulative oil, bbl
35.2M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 2, 1990
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 126 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hildebrand O-10-24798Conger (Penn)Burk Royalty Co., Ltd.1251M35.1MJan 1993 – Jul 2026
Hildebrand G-10-140941Conger (Penn)Wagner & Brown, Ltd.1089.3KJan 1993 – Feb 1995

Gas, mcf lease total

Last 12 months 230,317 · prior 12 266,629(-14%)

010K20K30K202420252026

Oil, barrels lease total

Last 12 months 8,238 · prior 12 8,493(-3%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Wagner & Brown, Ltd.Jan 1993 → Dec 2003
  2. 2Range Production CompanyJan 2004 → Jul 2014
  3. 3EQT Production Texas, LLCAug 2014 → Jun 2018
  4. 4Stanolind Production LLCJul 2018 → Dec 2020
  5. 5Slant Operating, LLCJan 2021 → Dec 2021
  6. 6Burk Royalty Co., Ltd.Jan 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
364190-99DrillWagner & BrownSep 21, 1989Sep 25, 1989Oct 14, 19899,750

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-140941————
—— O-10-24798————

Formation tops

As filed on W-2/G-1. Subsea from 2,565 ft elevation.Download CSV →

FormationMD ftSubsea
Wolfcamp6,057-3,492
Cisco7,160-4,595
Canyon7,489-4,924
Strawn8,643-6,078
Fusselman8,918-6,353

Perforations

Perforated and open-hole intervals.

FromToType
7,2027,363Perforated
7,5677,711Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37511817.5125 S
8.6251,99511800 S
5.59,1197.8751,175 S
8.625—12.25365 S
5.5—7.875500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 10, 1995Dec 15, 1994—
00May 26, 1992Feb 28, 1992—
00Mar 30, 1992——
00Apr 18, 1990Mar 20, 1990Yes
00Apr 10, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43132032, documented in the API reference.