TEXAS · WELLS · STONEWALL COUNTY · MARTIN "137" LEASE · API 42-433-00935 · DISTRICT 6E

Martin 137 #9WI

Shut in

Stonewall County · Tompkins (Cambrian) field · Shut In  · Vertical

Martin 137 #9WI (API 42-433-00935) is a well in Stonewall County operated by Scout Energy Management LLC, completed December 9, 2011 and listed as shut in on the RRC schedule, shut in August 1, 2016.

The RRC has issued one drilling permit, issued August 31, 2011, permitted to 6,524 ft.

It was permitted by L.C.S. Production Company and has since transferred to Scout Energy Management LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Canyon, Cambrian.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit.

Operator of record

Scout Energy Management LLC

Permitted by L.C.S. Production Company; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Sep 22, 2025
Permits on file
483
Phone
(972) 277-1397

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleScout Energy Management LLC
Production reportsnone
Latest permitL.C.S. Production CompanyAug 31, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,524
total depth, ft
1
permits on file
Aug 31, 2011
last permit issued
Dec 9, 2011
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 9, 2011
Shut in
Aug 1, 2016
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Martin "137" O-8-31088Tompkins (Cambrian)Scout Energy Management LLC100Dec 2011 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
723198-99ReenterL.C.S. Production CompanyAug 26, 2011Aug 31, 2011Sep 1, 20116,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 9, 2011Martin 137 O-8-31088Tompkins (Cambrian)Scout Energy Management LLCShut In · shut in Aug 1, 20166,524

Formation tops

As filed on W-2/G-1. Subsea from 1,704 ft elevation.Download CSV →

FormationMD ftSubsea
CanyonCANYON SAND4,950-3,246
Cambrian5,290-3,586

Perforations

Perforated and open-hole intervals.

FromToType
4,9544,970Perforated
5,2905,550Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7517212.25200 S
5.56,5177.875300 S
5.5—8.751,210 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 29, 2013Jan 18, 2012—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
791K
bbl, all reported
Sep 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000103101H-1 InjectionActive5,0002,4754,950–6,524

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43300935, documented in the API reference.