TEXAS · WELLS · STONEWALL COUNTY · MCMILLIAN, I.S. ACT. 2 LEASE · API 42-433-30995 · DISTRICT 6E

McMillian I.S. Act. 2 #9

Shut in

Stonewall County · Frankirk NE. (Canyon) field · Shut In  · Vertical

Mcmillian I.S. Act. 2 #9 (API 42-433-30995) is a well in Stonewall County operated by L.C.S. Production Company, completed May 23, 1980 and listed as shut in on the RRC schedule, shut in January 1, 1998.

The RRC has issued one drilling permit, issued December 11, 1979, permitted to 5,800 ft.

It was permitted by Texas Pacific Oil Company, Inc. and has since transferred to L.C.S. Production Company on the wellbore schedule.

Completion filings report one formation top, including Canyon.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit.

Operator of record

L.C.S. Production Company

Permitted by Texas Pacific Oil Company, Inc.; the EWA schedule now lists a different operator.

Based in
Abilene, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 14, 2026
Permits on file
1,707
Phone
(325) 692-3903

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleL.C.S. Production Company
Production reportsnone
Latest permitTexas Pacific Oil Company, Inc.Dec 11, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,800
total depth, ft
1
permits on file
Dec 11, 1979
last permit issued
May 23, 1980
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 23, 1980
Shut in
Jan 1, 1998
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McMillian, I.S. Act. 2 O-8-16050Frankirk, NE. (Canyon)L.C.S. Production Company100Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
66479-99DrillTexas Pacific Oil Company, Inc.Dec 11, 1979Dec 11, 1979Apr 30, 19805,800

Completions

CompletedLeaseFieldOperatorStatusDepth
May 23, 1980McMillian I.S. Act. 2 O-8-16050Frankirk NE. (Canyon)L.C.S. Production CompanyShut In · shut in Jan 1, 19985,800
May 23, 1980McMillian I.S. Act. 2 O-8-16050Frankirk NE. (Canyon)L.C.S. Production CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 1,804 ft elevation.Download CSV →

FormationMD ftSubsea
Canyon5,032-3,228

Perforations

Perforated and open-hole intervals.

FromToType
3,3423,450Perforated
5,0505,058Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62522512.25200 S
2.3755,046——
5.55,3007.875175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 20, 1985May 2, 1985—
00May 17, 1985Jun 16, 1980—
00Jan 12, 1984Jun 16, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
457K
bbl, all reported
Sep 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000054848W-14 DisposalActive3,5001,5003,342–3,450

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43330995, documented in the API reference.