WELL · 42-433-31769 · DISTRICT 7
Hallum Dora #1
Stonewall County · Jamie Lynn (Caddo) field · Vertical
Hallum Dora #1 (API 42-433-31769) is a plugged well in Stonewall County, plugged June 17, 2003, last operated by Remuda Operating Company.
The RRC has issued 2 drilling permits between 1983 and 1984, permitted to 6,600 ft.
Completion filings report 5 formation tops, including Coleman Junction, Canyon, Strawn, Caddo.
Its lease has reported 987 barrels of oil and 82 mcf of gas since January 1993, last reporting in September 2003.
Operator of record
- Based in
- Midland, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Apr 4, 2025
- Permits on file
- 214
- Phone
- (432) 684-8003
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Remuda Operating Company |
| Production reports | Remuda Operating Companythrough Jan 2001 |
| Latest permit | Remuda Operating CompanyApr 24, 1984 |
- 6,600
- total depth, ft
- 2
- permits on file
- Apr 24, 1984
- last permit issued
- Apr 10, 1984
- completed
- 987
- cumulative oil, bbl
- 82
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 10, 1984
- Shut in
- —
- Plugged
- Jun 17, 2003
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hallum, Dora O-8-21082 | Jamie Lynn (Caddo) | Remuda Operating Company | 1 | 987 | 82 | Jan 1993 – Sep 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Remuda Operating CompanyJan 1993 → May 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 236546-99 | Recompletion | Remuda Operating Company | Apr 16, 1984 | Apr 24, 1984 | — | 6,600 |
| 223543-99 | Drill | Remuda Operating Company | Dec 12, 1983 | Dec 13, 1983 | — | 6,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-21082 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,768 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman JunctionBASE COLEMAN JUNCTION | 2,767 | -999 |
| CanyonCANYON LIME | 5,296 | -3,528 |
| StrawnSTRAWN LIME | 6,063 | -4,295 |
| Caddo | 6,110 | -4,342 |
| Conglomerate | 6,215 | -4,447 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,127 | 6,133 | Perforated |
| 6,216 | 6,217 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 170 | 11 | 150 sx |
| 5.5 | 6,503 | 7.875 | 200 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 8, 1984 | Apr 13, 1984 | — |
| 00 | Jun 8, 1984 | Apr 10, 1984 | — |
| 00 | May 18, 1984 | Apr 13, 1984 | — |
| 00 | May 17, 1984 | Apr 10, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-433-31769 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-433-31769 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43331769, documented in the API reference.