WELL · 42-435-33523 · DISTRICT 7

Bloodworth 139 #6

Plugged

Sutton County · Sawyer (Canyon) field  · Vertical

Bloodworth 139 #6 (API 42-435-33523) is a plugged well in Sutton County, plugged January 6, 2016, last operated by Enervest Operating L.L.C..

The RRC has issued one drilling permit, issued November 21, 1989, permitted to 7,900 ft.

It was permitted by American Exploration Company and has since transferred to Enervest Operating L.L.C. on the wellbore schedule.

Completion filings report one formation top, including Canyon.

Operator of record

Enervest Operating L.L.C.

Permitted by American Exploration Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jan 13, 2026
Permits on file
1,249
Phone
(713) 659-3500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEnervest Operating L.L.C.
Production reportsnone
Latest permitAmerican Exploration CompanyNov 21, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,900
total depth, ft
1
permits on file
Nov 21, 1989
last permit issued
Jun 8, 1990
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2016

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 8, 1990
Shut in
—
Plugged
Jan 6, 2016

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bloodworth 139 G-9-135035Sawyer (Canyon)Enervest Operating, L.L.C.100Jan 1993 – Jan 2016

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
366507-99DrillAmerican Exploration CompanyNov 15, 1989Nov 21, 1989—7,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-135035————

Formation tops

As filed on W-2/G-1. Subsea from 2,277 ft elevation.Download CSV →

FormationMD ftSubsea
CanyonCANYON (TOP)6,340-4,063
CanyonCANYON (BTM)7,474-5,197

Perforations

Perforated and open-hole intervals.

FromToType
7,2687,468Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,01911700 S
4.57,5717.875490 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 7, 1990Jun 12, 1990Yes
00Jul 17, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43533523, documented in the API reference.