TEXAS · WELLS · SUTTON COUNTY · GALBREATH 66 LEASE · API 42-435-34241 · DISTRICT 6E

Galbreath 66 #10

Shut in

Sutton County · Sawyer (Canyon) field · Temp Abandoned  · Vertical

Galbreath 66 #10 (API 42-435-34241) is a well in Sutton County operated by Upp Operating LLC, completed September 26, 1994 and listed as temp abandoned on the RRC schedule, shut in December 1, 2014.

The RRC has issued one drilling permit, issued April 11, 1994, permitted to 6,050 ft.

It was permitted by American Exploration Company and has since transferred to Upp Operating LLC on the wellbore schedule.

Completion filings report one formation top, including Canyon.

Its lease has reported 879 barrels of oil and 253K mcf of gas since September 1994, with no volume in the three years through April 2026.

Operator of record

Upp Operating LLC

Permitted by American Exploration Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 6, 2026
Permits on file
33
Phone
(713) 495-5300

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUpp Operating LLC
Production reportsUpp Operating, LLCthrough Sep 2022
Latest permitAmerican Exploration CompanyApr 11, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,050
total depth, ft
1
permits on file
Apr 11, 1994
last permit issued
Sep 26, 1994
completed
879
cumulative oil, bbl
253K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1994 THROUGH Sep 2022

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 26, 1994
Shut in
Dec 1, 2014
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Galbreath 66 G-9-151522Sawyer (Canyon)Upp Operating, LLC1879253KSep 1994 – Sep 2022

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1American Exploration CompanySep 1994 → Jul 1995
  2. 2Dreyfus, Louis Natural Gas CorpAug 1995 → Nov 2001
  3. 3Dominion Oklahoma Texas E&P, IncDec 2001 → Dec 2007
  4. 4Highmount Expl & Prod Texas LLCJan 2008 → Sep 2014
  5. 5Enervest Operating, L.L.C.Oct 2014 → Feb 2019
  6. 6Upp Operating, LLCDec 2020 → Sep 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
422816-99DrillAmerican Exploration CompanyApr 8, 1994Apr 11, 1994Sep 6, 19946,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 26, 1994Galbreath 66 G-9-151522Sawyer (Canyon)Upp Operating LLCTemp Abandoned · shut in Dec 1, 20146,050

Formation tops

As filed on W-2/G-1. Subsea from 2,120 ft elevation.Download CSV →

FormationMD ftSubsea
Canyon5,414-3,294
CanyonCANYON (BTM)5,878-3,758

Perforations

Perforated and open-hole intervals.

FromToType
5,4155,870Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62585311350 S
4.56,0377.875500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Dec 1, 1994Oct 11, 1994Yes
00Nov 2, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43534241, documented in the API reference.