WELL · 42-435-34527 · DISTRICT 7
Cauthorn Mildred 19 #3
Sutton County · JO Nell (Canyon D) field · Vertical
Cauthorn Mildred 19 #3 (API 42-435-34527) is a plugged well in Sutton County, plugged November 24, 1999, last operated by Smith Pipe Of Abilene.
The RRC has issued one drilling permit, issued May 23, 1995, permitted to 10,000 ft.
It was permitted by Pogo Producing CO. and has since transferred to Smith Pipe Of Abilene on the wellbore schedule.
Completion filings report 2 formation tops, including Base Cretaceous (marker), Canyon.
Operator of record
Permitted by Pogo Producing Co.; the EWA schedule now lists a different operator.
- Based in
- Abilene, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Aug 29, 2014
- Phone
- (325) 692-3903
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Smith Pipe of Abilene |
| Production reports | TXP, Incorporatedthrough May 1998 |
| Latest permit | Pogo Producing Co.May 23, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,000
- total depth, ft
- 1
- permits on file
- May 23, 1995
- last permit issued
- Sep 26, 1995
- completed
- 0
- cumulative oil, bbl
- 8.46K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 1995 THROUGH Nov 1999
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 26, 1995
- Shut in
- —
- Plugged
- Nov 24, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cauthorn, Mildred 19 G-9-156170 | JO Nell (Canyon D) | Smith Pipe of Abilene | 1 | 0 | 8.46K | Sep 1995 – Nov 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pogo Producing CompanySep 1995 → Sep 1995
- 2Synergy Production CompanyJan 1996 → Jan 1996
- 3Synergy Oil & Gas, Inc. (A)Feb 1996 → Feb 1998
- 4TXP, IncorporatedMay 1998 → May 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 436166-99 | Drill | Pogo Producing Co. | May 23, 1995 | May 23, 1995 | Jun 3, 1995 | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-156170 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 10 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base Cretaceous (marker)BASE OF CRETACEOUS | 980 | -970 |
| CanyonLOWER CANYON | 6,350 | -6,340 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,075 | 9,225 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,260 | 12.25 | 450 S |
| 7 | 8,224 | 8.75 | 320 S |
| 4.5 | 9,424 | 6.125 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 11, 1996 | Oct 20, 1995 | Yes |
| 00 | Dec 8, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-435-34527 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-435-34527 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43534527, documented in the API reference.