WELL · 42-435-34606 · DISTRICT 7

Fields 20 #7

N

Sutton County · Sawyer (Canyon) field  · Vertical

Fields 20 #7 (API 42-435-34606) is a well in Sutton County operated by Dominion Oklahoma Texas E&P Inc, completed September 15, 1996.

The RRC has issued 2 drilling permits between 1996 and 2002, permitted to 7,500 ft.

Completion filings report 5 formation tops, including Base Cretaceous (marker), Wolfcamp, Canyon, Strawn.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 41.6K barrels injected in the 12 months reported through October 2025.

Operator of record

Dominion Oklahoma Texas E&P Inc

Richmond, VA · P-5 Y, filed Sep 6, 2019 · 3,810 permits on file · (804) 819-2000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDominion Oklahoma Texas E&P Inc
Production reportsDominion Oklahoma Texas E&P, Incthrough Apr 2002
Latest permitDominion Oklahoma Texas E&P, IncMay 8, 2002
7,500
total depth, ft
2
permits on file
May 8, 2002
last permit issued
Sep 15, 1996
completed
0
cumulative oil, bbl
72.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 15, 1996
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Fields 20 G-9-228743Sonora (Ellenburger)Upp Operating, LLC100Jul 2005 – Jul 2026
Fields 20 G-9-162108Sawyer (Canyon)Dominion Oklahoma Texas E&P, Inc1072.6KSep 1996 – Jun 2005

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Dreyfus, Louis Natural Gas CorpSep 1996 → Nov 2001
  2. 2Dominion Oklahoma Texas E&P, IncDec 2001 → Apr 2002

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
519826-99RecompletionDominion Oklahoma Texas E&P, IncMay 8, 2002May 8, 2002May 15, 20027,500
450266-99DrillDreyfus, Louis Natural Gas CorpJul 11, 1996Jul 11, 1996Aug 21, 19967,050

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-162108————
—— G-9-228743————

Formation tops

As filed on W-2/G-1. Subsea from 2,121 ft elevation.Download CSV →

FormationMD ftSubsea
Base Cretaceous (marker)BASE CRETACEOUS6951,426
Wolfcamp2,604-483
Canyon5,176-3,055
Strawn6,428-4,307
Ellenburger7,090-4,969

Perforations

Perforated and open-hole intervals.

FromToType
5,6865,704Perforated
6,4287,500Perforated
6,4306,470Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,04611325 S
8.6251,04911325 S
4.56,5617.875750 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 16, 2024Feb 15, 2024—
00Sep 10, 2007Aug 2, 2002Yes
00Aug 7, 2007——
00Apr 7, 1997Mar 13, 1997Yes
00Mar 27, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

41.6K
bbl, last 12 reported months
4.24M
bbl, all reported
Oct 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000092083H-1 InjectionActive3,0003,0006,428–7,500

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 41,588 · prior 12 61,761(-33%)

05K10K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43534606, documented in the API reference.