TEXAS · WELLS · SUTTON COUNTY · KELLY 125 LEASE · API 42-435-34733 · DISTRICT 6E

Kelly 125 #16

Y

Sutton County · Sawyer (Canyon) field · Producing  · Vertical

Kelly 125 #16 (API 42-435-34733) is a well in Sutton County operated by Upp Operating LLC, completed September 9, 1997 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued July 2, 1997, permitted to 6,854 ft.

It was permitted by Dreyfus, Louis Natural Gas Corp and has since transferred to Upp Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Base Cretaceous (marker), Wlfcmp, Canyon.

Its lease has reported 2.24K barrels of oil and 345K mcf of gas since September 1997, last reporting volume in April 2026.

Operator of record

Upp Operating LLC

Permitted by Dreyfus, Louis Natural Gas Corp; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 6, 2026
Permits on file
33
Phone
(713) 495-5300

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUpp Operating LLC
Production reportsUpp Operating, LLCthrough Apr 2026
Latest permitDreyfus, Louis Natural Gas CorpJul 2, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,854
total depth, ft
1
permits on file
Jul 2, 1997
last permit issued
Sep 9, 1997
completed
2.24K
cumulative oil, bbl
345K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1997 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 9, 1997
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kelly 125 G-9-166245Sawyer (Canyon)Upp Operating, LLC12.24K345KSep 1997 – Apr 2026

Gas, mcf lease total

Last 12 months 2,621 · prior 12 3,072(-15%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Dreyfus, Louis Natural Gas CorpSep 1997 → Aug 2001
  2. 2Dominion Oklahoma Texas E&P, IncNov 2006 → Dec 2007
  3. 3Highmount Expl & Prod Texas LLCJan 2008 → Sep 2014
  4. 4Enervest Operating, L.L.C.Oct 2014 → Mar 2019
  5. 5Upp Operating, LLCApr 2019 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
464504-99DrillDreyfus, Louis Natural Gas CorpJul 2, 1997Jul 2, 1997Aug 22, 19976,850

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 9, 1997Kelly 125 G-9-166245Sawyer (Canyon)Upp Operating LLCProducing6,854

Formation tops

As filed on W-2/G-1. Subsea from 2,225 ft elevation.Download CSV →

FormationMD ftSubsea
Base Cretaceous (marker)BASE CRETACEOUS8451,380
Wlfcmp2,575-350
Canyon5,096-2,871

Perforations

Perforated and open-hole intervals.

FromToType
5,3066,496Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,24011275 S
4.56,8277.875550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Feb 25, 1998Dec 11, 1997Yes
00Feb 4, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43534733, documented in the API reference.