WELL · 42-435-35797 · DISTRICT 7

Vanderstucken 51 #9

Plugged

Sutton County · Sawyer (Canyon) field  · Vertical

Vanderstucken 51 #9 (API 42-435-35797) is a plugged well in Sutton County, plugged November 9, 2007, last operated by Smith Pipe Of Abilene.

The RRC has issued one drilling permit, issued March 5, 2002, permitted to 6,075 ft.

It was permitted by Dominion Oklahoma Texas E&P, Inc and has since transferred to Smith Pipe Of Abilene on the wellbore schedule.

Completion filings report 3 formation tops, including Base Cretaceous (marker), Wolfcamp, Canyon.

Operator of record

Smith Pipe of Abilene

Permitted by Dominion Oklahoma Texas E&P, Inc; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed Jul 3, 2024 · (325) 665-4407

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSmith Pipe of Abilene
Production reportsDominion Oklahoma Texas E&P, Incthrough Oct 2002
Latest permitDominion Oklahoma Texas E&P, IncMar 5, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,075
total depth, ft
1
permits on file
Mar 5, 2002
last permit issued
Mar 27, 2002
completed
0
cumulative oil, bbl
2.52K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2002 THROUGH Nov 2007

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 27, 2002
Shut in
—
Plugged
Nov 9, 2007

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Vanderstucken 51 G-9-189758Sawyer (Canyon)Smith Pipe of Abilene102.52KMar 2002 – Nov 2007

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Dominion Oklahoma Texas E&P, IncMar 2002 → Oct 2002

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
518072-99DrillDominion Oklahoma Texas E&P, IncMar 5, 2002Mar 5, 2002Mar 9, 20026,075

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-189758————

Formation tops

As filed on W-2/G-1. Subsea from 2,285 ft elevation.Download CSV →

FormationMD ftSubsea
Base Cretaceous (marker)BASE CRETACEOUS8881,397
Wolfcamp2,540-255
Canyon4,882-2,597

Perforations

Perforated and open-hole intervals.

FromToType
5,5185,774Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,15611240 S
4.56,0747.875430 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 19, 2002Jul 19, 2002Yes
00Aug 7, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43535797, documented in the API reference.