TEXAS · WELLS · SUTTON COUNTY · FRAZIER, JOE LEASE · API 42-435-37140 · DISTRICT 6E
Frazier Joe #1
Sutton County · Cedar Rock (Canyon) field · Vertical
Frazier Joe #1 (API 42-435-37140) is a plugged well in Sutton County, plugged May 13, 2026, last operated by Xog Operating LLC.
The RRC has issued 2 drilling permits (amended 3 times) between 2001 and 2004, permitted to 6,500 ft.
Completion filings report 4 formation tops, including Base Cretaceous (marker), Wolfcamp, Canyon, Strawn.
Operator of record
- Based in
- Midland, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Dec 23, 2025
- Permits on file
- 137
- Phone
- (432) 671-3171
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | XOG Operating LLCthrough Jul 2024 |
| Latest permit | XOG Operating LLCOct 21, 2004 |
- 6,500
- total depth, ft
- 5
- permits on file
- Oct 21, 2004
- last permit issued
- Apr 1, 2005
- completed
- 0
- cumulative oil, bbl
- 43.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2005 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 1, 2005
- Shut in
- —
- Plugged
- May 13, 2026
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Frazier, Joe G-9-216062 | Cedar Rock (Canyon) | XOG Operating LLC | 1 | 0 | 43.2K | Apr 2005 – Apr 2026 |
Gas, mcf lease total
Last 12 months 0 · prior 12 94(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1XOG Operating LLCJul 2005 → Jul 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 552471-97 | Drill | XOG Operating LLC | Dec 12, 2005 | Oct 21, 2004 | — | 6,500 |
| 552471-98 | Drill | Xeric Oil & Gas Corporation | Feb 24, 2005 | Oct 21, 2004 | — | 6,500 |
| 552471-99 | Drill | Xeric Oil & Gas Corporation | Oct 19, 2004 | Oct 21, 2004 | — | 6,500 |
| 509096-98 | Drill | Xeric Oil & Gas Corporation | Jul 5, 2001 | May 17, 2001 | — | 6,500 |
| 509096-99 | Drill | Xeric Oil & Gas Corporation | May 17, 2001 | May 17, 2001 | — | 5,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 1, 2005 | Frazier Joe G-9-216062 | Cedar Rock (Canyon) | XOG Operating LLC | Plugged | — |
Formation tops
As filed on W-2/G-1. Download CSV →
| Formation | MD ft |
|---|---|
| Base Cretaceous (marker)BASE CRETACEOUS | 815 |
| Wolfcamp | 1,750 |
| Canyon | 4,180 |
| Strawn | 5,130 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,246 | 4,252 | Perforated |
| 4,262 | 4,274 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 852 | 11 | 320 S |
| 4.5 | 6,438 | 7.875 | 800 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 20, 2006 | Sep 12, 2005 | Yes |
| 00 | May 26, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-435-37140 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-435-37140 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43537140, documented in the API reference.