WELL · 42-435-37260 · DISTRICT 7
Sawyer-Jones #1906
Sutton County · Vertical
Sawyer-Jones #1906 (API 42-435-37260) is a plugged well in Sutton County, plugged March 11, 2005, last operated by Dominion Oklahoma Texas E&P, Inc.
The RRC has issued 2 drilling permits (amended once) between 2005 and 2006, permitted to 9,000 ft.
Completion filings report 4 formation tops, including Canyon, Strawn, Base Cretaceous (marker), Wolfcamp.
Operator of record
Dominion Oklahoma Texas E&P, Inc
Richmond, VA · P-5 Y, filed Sep 6, 2019 · 3,810 permits on file · (804) 819-2000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Upp Operating, LLCthrough Apr 2026 |
| Latest permit | Dominion Oklahoma Texas E&P, IncOct 31, 2006 |
- 9,000
- total depth, ft
- 3
- permits on file
- Oct 31, 2006
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 449K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Mar 11, 2005
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sawyer-Jones G-9-243166 | Sawyer (Canyon) | Upp Operating, LLC | 1 | 0 | 449K | Dec 2006 – Jul 2026 |
| Sawyer-Jones G-9-243168 | Sawyer (Strawn, North) | Upp Operating, LLC | 1 | 0 | 0 | Dec 2006 – Jul 2026 |
Gas, mcf lease total
Last 12 months 1,680 · prior 12 2,026(-17%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Highmount Expl & Prod Texas LLCDec 2006 → Sep 2014
- 2Enervest Operating, L.L.C.Oct 2014 → Mar 2019
- 3Upp Operating, LLCApr 2019 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 628280-99 | Reenter | Dominion Oklahoma Texas E&P, Inc | Oct 30, 2006 | Oct 31, 2006 | Nov 1, 2006 | 8,995 |
| 556735-98 | Drill | Marshall & Winston, Inc. | Feb 4, 2005 | Jan 25, 2005 | Feb 28, 2005 | 9,000 |
| 556735-99 | Drill | Ogs Operating Company, Inc. | Jan 25, 2005 | Jan 25, 2005 | — | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-243166 | — | — | — | — |
| — | — G-9-243168 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,091 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Canyon | 5,840 | -3,749 |
| Strawn | 8,560 | -6,469 |
| Base Cretaceous (marker)BASE CRETACEOUS | — | — |
| Wolfcamp | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,842 | 7,258 | Perforated |
| 8,561 | 8,570 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 8,894 | 7.875 | 1,000 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 21, 2009 | Jul 24, 2007 | — |
| 00 | Jan 16, 2009 | Jul 24, 2007 | Yes |
| 00 | Dec 18, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-435-37260 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-435-37260 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43537260, documented in the API reference.