WELL · 42-435-38728 · DISTRICT 7
Canyon Ranch 114 #5S
Sutton County · Sawyer (Canyon) field · Vertical
Canyon Ranch 114 #5S (API 42-435-38728) is a plugged well in Sutton County, plugged May 28, 2015, last operated by Enervest Operating L.L.C..
The RRC has issued one drilling permit, issued October 19, 2007, permitted to 7,000 ft.
It was permitted by Dominion Oklahoma Texas E&P, Inc and has since transferred to Enervest Operating L.L.C. on the wellbore schedule.
Completion filings report 3 formation tops, including Base Cretaceous (marker), Wolfcamp, Canyon.
Operator of record
Permitted by Dominion Oklahoma Texas E&P, Inc; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Oct 4, 2025 · 1,249 permits on file · (713) 659-3500
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Enervest Operating L.L.C. |
| Production reports | Highmount Expl & Prod Texas LLCthrough Nov 2010 |
| Latest permit | Dominion Oklahoma Texas E&P, IncOct 19, 2007 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,000
- total depth, ft
- 1
- permits on file
- Oct 19, 2007
- last permit issued
- Jan 11, 2008
- completed
- 0
- cumulative oil, bbl
- 20.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2008 THROUGH May 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 11, 2008
- Shut in
- —
- Plugged
- May 28, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Canyon Ranch 114 G-9-239577 | Sawyer (Canyon) | Enervest Operating, L.L.C. | 1 | 0 | 20.5K | Jan 2008 – May 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Highmount Expl & Prod Texas LLCJan 2008 → Nov 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 647652-99 | Drill | Dominion Oklahoma Texas E&P, Inc | Oct 11, 2007 | Oct 19, 2007 | Dec 19, 2007 | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-239577 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,293 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base Cretaceous (marker)BASE CRETACEOUS | 986 | 1,307 |
| Wolfcamp | 1,150 | 1,143 |
| Canyon | 3,572 | -1,279 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,278 | 4,890 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,112 | 11 | 467 S |
| 4.5 | 5,189 | 7.875 | 490 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 11, 2008 | May 8, 2008 | Yes |
| 00 | Oct 4, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-435-38728 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-435-38728 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43538728, documented in the API reference.