WELL · 42-441-34691 · DISTRICT 8

ETC207 #1

N

Taylor County  · Vertical

Etc207 #1 (API 42-441-34691) is a permitted well in Taylor County filed by Sunoco Pipeline L.P.; no completion report is on file yet.

The RRC has issued one drilling permit, issued January 25, 2024, permitted to 400 ft.

Operator of record

Sunoco Pipeline L.P.

Houston, TX · P-5 Y, filed Aug 4, 2025 · 165 permits on file · (800) 777-6444

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitSunoco Pipeline L.P.Jan 25, 2024
400
total depth, ft
1
permits on file
Jan 25, 2024
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

32.489729, -100.057625

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Taylor County.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
896710-99DrillSunoco Pipeline L.P.Jan 22, 2024Jan 25, 2024—400

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well has no tops filed, so it cannot anchor a section; its neighbours can.

Section of the neighbours →

Reynolds Unit42-441-33783

2.5 KM · Ventex Operating Corp. · Section with this well →

Coleman Junction1,80021
Coleman Jet1,950-129
Noodle Creek2,415-594
Saddle Creek2,750-929
Flippen - Disposal2,770-949
Cook - Disposal2,850-1,029
Hope Lime - Disposal2,890-1,069
Swastika - Disposal3,115-1,294

15 TOPS · FIRST 8

Young, J.O.42-441-33575

2.7 KM · Ventex Operating Corp. · Section with this well →

Noodle Creek2,473-645
Cisco3,074-1,246
Canyon4,450-2,622
Strawn4,626-2,798

Bland 'B'42-441-34566

2.9 KM · Sojourner Drilling Corporation · Section with this well →

Coleman Junction1,900-16
Saddle Creek2,670-786
Flippen - Disposal2,750-866
Cook - Disposal2,900-1,016
Hope Lime - Disposal2,940-1,056
Swastika - Disposal3,200-1,316
Palo Pinto4,590-2,706
Unidentified-County Regular - DI—

10 TOPS · FIRST 8

Bland42-441-34565

3.9 KM · Sojourner Drilling Corporation · Section with this well →

Coleman Junction1,90021
Saddle Creek2,670-749
Flippen - Disposal2,750-829
Cook - Disposal2,900-979
Hope Lime - Disposal2,940-1,019
Swastika - Disposal3,200-1,279
Palo Pinto4,590-2,669
Cisco—

10 TOPS · FIRST 8

Bland 'A'42-441-31698

4.0 KM · Williams-Gieger Resources, Inc. · Section with this well →

Coleman Junction1,420495
Swastika Sand3,210-1,295

Dusty Farmer42-253-35687

9.0 KM · Sojourner Drilling Corporation · Section with this well →

Coleman Junction1,8329
Flippen Lime - Disposal2,688-847
Hope Lime - Disposal2,868-1,027
King Sand - Disposal3,100-1,259
Dothan Sand - Disposal—
Frye - Disposal—
Leonard—
Tannehill—

10 TOPS · FIRST 8

Sears 'B'42-253-35594

9.2 KM · Sojourner Drilling Corporation · Section with this well →

Noodle Creek2,630-793
Flippen Lime - Disposal2,705-868
Hope Lime - Disposal2,840-1,003
Frye - Disposal—
Valera Sand - Disposal—
Tannehill—
Coleman Junction—
Leonard—

10 TOPS · FIRST 8

Cade Freeman Unit42-253-35695

9.3 KM · Sojourner Drilling Corporation · Section with this well →

Leonard1,750166
Coleman Junction2,240-324
Flippen Lime - Disposal2,796-880
Hope Lime - Disposal2,925-1,009
King Sand - Disposal3,170-1,254
Tannehill—
Frye - Disposal—
Dothan Sand - Disposal—

10 TOPS · FIRST 8

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44134691, documented in the API reference.