WELL · 42-445-31260 · DISTRICT 8

Pool-Hannes 36 #4036

Plugged

Terry County · Terryon (Clearfork UP) field  · Vertical

Pool-Hannes 36 #4036 (API 42-445-31260) is a plugged well in Terry County, plugged August 3, 1994, last operated by Texland Petroleum L.P..

The RRC has issued 2 drilling permits (amended twice) between 1984 and 2004, permitted to 7,000 ft.

Completion filings report 3 formation tops, including Rustler, San Andres, Clear Fork.

Its 2 leases have reported 1.45M barrels of oil and 397K mcf of gas since January 1993, last reporting in July 2026. The leases carry 26 wells, so these are lease totals, not this well alone.

Operator of record

Texland Petroleum L.P.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Oct 15, 2025
Permits on file
694
Phone
(817) 336-2751

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexland Petroleum L.P.
Production reportsTexland Petroleum, L.P.through Apr 2026
Latest permitTexland Petroleum, L.P.Aug 20, 2004
7,000
total depth, ft
4
permits on file
Aug 20, 2004
last permit issued
Jun 5, 1991
completed
1.45M
cumulative oil, bbl
397K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 5, 1991
Shut in
—
Plugged
Aug 3, 1994

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 26 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pool-Hannes "36" O-11-64914Terryon (Clearfork, UP)Texland Petroleum, L.P.6111K26.6KJan 1993 – Jul 2026
Pool-Hannes "36" O-11-65666Sunflower (San Andres)Texland Petroleum, L.P.201.34M370KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 36,964 · prior 12 37,369(-1%)

02K4K202420252026

Gas, mcf lease total

Last 12 months 9,661 · prior 12 8,483(+14%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texland-Rector & SchumacherJan 1993 → Nov 2000
  2. 2Texland Petroleum Inc.Dec 2000 → Mar 2003
  3. 3Texland Petroleum, L.P.Apr 2003 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
549729-97ReenterTexland Petroleum, L.P.Apr 16, 2007Aug 20, 2004Sep 9, 20047,000
549729-98ReenterTexland Petroleum, L.P.Mar 16, 2007Aug 20, 2004Sep 9, 20047,000
549729-99ReenterTexland Petroleum, L.P.Aug 18, 2004Aug 20, 2004Sep 9, 20047,000
256693-99DrillTexland-Rector & SchumacherNov 1, 1984Nov 2, 1984—7,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-64914————
—— O-11-65666————

Formation tops

As filed on W-2/G-1. Subsea from 3,505 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler2,517988
San Andres4,562-1,057
Clear ForkUPPER CLEARFORK6,657-3,152

Perforations

Perforated and open-hole intervals.

FromToType
5,2765,291Perforated
6,5806,861Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,51212.25975 S
5.56,5807.8751,650 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 25, 2007Mar 12, 2007Yes
00May 18, 2007——
00Jan 15, 1992Nov 4, 1991—
00Jul 22, 1985Jun 14, 1985—
00Jul 3, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44531260, documented in the API reference.