WELL · 42-445-32223 · DISTRICT 8

Mallet #1

Y

Terry County · Terryon (Glorieta) field · Producing  · Vertical

Mallet #1 (API 42-445-32223) is a well in Terry County operated by R3 Operating Corporation, completed April 21, 2010 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits (amended once) between 2009 and 2010, permitted to 9,000 ft.

It was permitted by Trail Mountain, Inc. and has since transferred to R3 Operating Corporation on the wellbore schedule.

Completion filings report 7 formation tops, including Rustler, Yates, San Andres, Glorieta.

Its lease has reported 48.4K barrels of oil since January 2010, last reporting in July 2026.

Operator of record

R3 Operating Corporation

Permitted by Trail Mountain, Inc.; the EWA schedule now lists a different operator.

Greenwood VLG, CO · P-5 Y, filed Jun 4, 2026 · (855) 826-9001

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleR3 Operating Corporation
Production reportsR3 Operating Corporationthrough Apr 2026
Latest permitTrail Mountain, Inc.Sep 14, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
3
permits on file
Sep 14, 2010
last permit issued
Apr 21, 2010
completed
48.4K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 21, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mallet O-11-69491Terryon (Glorieta)R3 Operating Corporation148.4K0Jan 2010 – Jul 2026

Oil, barrels lease total

Last 12 months 4,201 · prior 12 4,679(-10%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Trail Mountain, Inc.Jan 2010 → Jul 2014
  2. 2Boaz Energy II Operating, LLCAug 2014 → Mar 2025
  3. 3T2 Operating CorporationApr 2025 → Jul 2025
  4. 4R3 Operating CorporationAug 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
701016-99RecompletionTrail Mountain, Inc.Aug 20, 2010Sep 14, 2010Sep 28, 20098,875
677219-98DrillTrail Mountain, Inc.Mar 12, 2010Jan 21, 2009Sep 28, 20099,000
677219-99DrillTrail Mountain, Inc.Jan 9, 2009Jan 21, 2009Sep 28, 20099,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-69491————

Formation tops

As filed on W-2/G-1. Subsea from 3,486 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler2,4581,028
Yates3,123363
San Andres4,459-973
Glorieta5,921-2,435
Clear ForkUPPER CLEARFORK6,508-3,022
Tubb7,470-3,984
Clear ForkLOWER CLEARFORK7,672-4,186
Abo8,549-5,063

Perforations

Perforated and open-hole intervals.

FromToType
5,9385,942Perforated
5,9505,954Perforated
5,9685,986Perforated
6,0226,026Perforated
6,0326,038Perforated
6,0426,062Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,32612.25930 S
5.58,8758.75800 S
5.5——1,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 22, 2010May 3, 2010—
00Mar 25, 2010Mar 1, 2010Yes
00Mar 23, 2010——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44532223, documented in the API reference.