TEXAS · WELLS · THROCKMORTON COUNTY · SHAW, JUANITA LEASE · API 42-447-30845 · DISTRICT 6E
Shaw Juanita #1
Throckmorton County · Throckmorton N. (Bas Canyon UP) field · Vertical
Shaw Juanita #1 (API 42-447-30845) is a plugged well in Throckmorton County, plugged September 18, 2003, last operated by Herring Ray.
The RRC has issued one drilling permit (amended twice), issued June 9, 1989, permitted to 3,365 ft.
Completion filings report one formation top, including Canyon.
Its lease has reported 3.28K barrels of oil and 29.1K mcf of gas since January 1993, last reporting in October 2003.
Operator of record
- Based in
- Graham, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Apr 18, 2013
- Permits on file
- 401
- Phone
- (940) 549-0370
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Herring Ray |
| Production reports | Herring, Raythrough May 2002 |
| Latest permit | Herring, RayJun 9, 1989 |
- 3,365
- total depth, ft
- 3
- permits on file
- Jun 9, 1989
- last permit issued
- Apr 23, 1989
- completed
- 3.28K
- cumulative oil, bbl
- 29.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 23, 1989
- Shut in
- —
- Plugged
- Sep 18, 2003
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Shaw, Juanita O-8-25500 | Throckmorton, N. (Bas Canyon UP) | Herring, Ray | 1 | 3.28K | 29.1K | Jan 1993 – Oct 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Herring, RayJan 1993 → May 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 360197-97 | Other | Herring, Ray | Aug 14, 1989 | Jun 9, 1989 | — | 3,365 |
| 360197-98 | Drill | Herring, Ray | Aug 7, 1989 | Jun 9, 1989 | — | 3,365 |
| 360197-99 | Drill | Herring, Ray | Jun 8, 1989 | Jun 9, 1989 | — | 3,363 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 23, 1989 | Shaw Juanita O-8-25500 | Throckmorton N. (Bas Canyon UP) | Herring Ray | Plugged | — |
| Jan 20, 1976 | Shaw Juanita O-8-12968 | Throckmorton County Regular | Herring Ray | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,301 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| CanyonBASAL CANYON | 3,077 | -1,776 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,067 | 3,071 | Perforated |
| 3,077 | 3,081 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 112 | 12.25 | 75 S |
| 4.5 | 3,365 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 25, 1989 | Aug 8, 1989 | — |
| 00 | Aug 24, 1989 | — | — |
| 00 | Jan 12, 1984 | Feb 10, 1976 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-447-30845 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-447-30845 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44730845, documented in the API reference.